Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2011-006-00 EXP CHAMP - TERRAQUA - COORD./U COL IMPLEMENTATION
Contract Start Date:
2/15/2015
Contract End Date:
2/14/2016
Title:
I: 132 - 18.2e Produce CY2015 Integrated RME Technical Report for ISEMP/CHaMP
Description:
Beginning in CY2015, the Integrated Status and Effectiveness Monitoring Program (ISEMP; BPA Project 2003-017-00) and Columbia Habitat Monitoring Program (CHaMP; BPA Project Number 2011-006-00) will produce a single joint technical report. Report materials will be developed by ISEMP and CHaMP contractors and delivered to Terraqua, Inc. for compilation into a single report for transfer to BPA.
WE Agreement Type:
Contracted
Deliverable Specification:
The ISEMP/CHaMP Integrated Technical Report will focus on:
1. Results from ISEMP Intensively Monitored Watersheds (IMWs).
2. Fish status and trend data.
3. Habitat status and trend data
4. Fish/habitat relationships.
5. Method/protocol updates.

Due to the performance dates of the contracts associated with this reporting requirement (2/15/2015 - 2/14/2016) the CY2015 RME Integrated ISEMP/CHaMP Technical report will be completed under subsequent FY16 contracts.
WSE Effective Budget:
$0
% of Total WSE Effective Budget:
0.00%
WSE Start:
02/15/2015
WSE End:
02/14/2016
WSE Completion:
WSE Progress:
Other
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 68504 (02/15/2015 - 02/14/2016) $0 $0 covered under WE 18.2a
Work Element Budget (Current Performance Period) $0 $0 covered under WE 18.2a

7 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Finalze CY2014 Integrated ISEMP/CHaMP RME Technical report 2/15/2015 4/30/2015 Concluded David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: Due to the performance periods of the contracts associated with this reporting requirement, work was begun on the CY2014 Integrated ISEMP/CHaMP RME Technical report under the FY14 contracts (2/15/2014- 2/14/2015) and will be completed under the current FY15 contract (2/15/2015 - 2/14/2016). Terraqua will work with CHaMP staff and collaborators to compile information for inclusion in the report and edit and produce the final report.
B RMET1 Prepare for calendar year RM&E Annual Technical Report: download template 11/1/2015 11/1/2015 Concluded David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: BPA fish and wildlife project sponsors who have the following work elements in their contract(s) are required to complete an RM&E technical report showing cumulative results and synthesis for the life of the studies objectives: 70 Install Equipment, 156 Develop RM&E Methods and Designs, 157 Collect/Generate/Validate Field and Lab Data, 158 Mark and Tag Animals, 159 Transfer/Consolidate Regionally Standardized Data, 160 Create/Manage/Maintain Database, and/or 162 Analyze/Interpret Data. Due to regulatory reporting requirements, BPA needs all sponsors to have draft reports submitted in January and final reports completed in March to align with BPA's BiOp and Council annual reporting timelines. Review all documentation and training materials in www.cbfish.org and create the report template for your technical report so you will know whether, or how much, your report may need to change to meet the new requirements. https://www.cbfish.org/Content/tutorials/Technical_Reporting_Guidance_2013.pdf (Milestone start/end: August 1 – October 1)
C Complete analysis necessary for the FCRPS BiOp RPA reporting 11/1/2015 2/14/2016 Concluded David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: Complete analysis necessary for the Integrated ISEMP/CHaMP CY2015 FCRPS RME Technical report.
D Develop material for inclusion in Integrated ISEMP/CHaMP technical report 1/1/2016 2/14/2016 Active David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: Develop material for inclusion in Integrated ISEMP/CHaMP technical report
E Review draft integrated ISEMP/CHaMP technical report 1/1/2016 2/14/2016 Active David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: Review draft integrated ISEMP/CHaMP technical report
F RMET2 Email draft calendar year 2015 RM&E Technical Report in MS Word for BPA review 2/14/2016 2/14/2016 Active David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: Create a template for your technical Annual Progress Report. Building off last year's report, develop a draft report on RM&E and data management actions and discuss relevancy of results to the Fish and Wildlife Program. Your report should include the cumulative data, analyses, and data management completed by your project by December 31st. Any activity after the last day of the calendar year should be included in a subsequent report. For example, if you have completed redd surveys, but have not completed the analyses, you will report the preliminary data (# of redds). You do not need to rush your analyses; they may be reported in the subsequent report. For more information, please see the guidance located at https://www.cbfish.org/Content/tutorials/Technical_Reporting_Guidance_2013. Upon completion, email a draft to your COTR and RMEsupport@bpa.gov for BPA review of the draft. If your Word file is too big to be emailed, upload it in Pisces as an “other” type with visibility to BPA and those in your contract, and send an email to your COTR and RMEsupport@bpa.gov to notify them you would like them to review. (Milestone start/end: September 15 - January 15)
G DELIV Develop draft integrated ISEMP/CHaMP technical report 2/14/2016 Active David Byrnes (Inactive) 4/7/2015 3:54:50 PM
Description: The ISEMP/CHaMP Integrated Technical Report will focus on: 1. Results from ISEMP Intensively Monitored Watersheds (IMWs). 2. Fish status and trend data. 3. Habitat status and trend data 4. Fish/habitat relationships. 5. Method/protocol updates. Due to the performance dates of the contracts associated with this reporting requirement (2/15/2015 - 2/14/2016) the CY2015 RME Integrated ISEMP/CHaMP Technical report will be completed under subsequent FY16 contracts.

Implementation Metrics
Metric Planned Actual Contractor Comments Measures HLIs
1768. Start date of reporting period 1/1/2013
1769. End date of reporting period 12/31/2013

This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata