SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $10,000 | $10,000 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | RMET1 | RM&E Technical: Prepare for RM&E Technical Report. Review the revised (2015) guidance & template | 10/5/2015 | 10/15/2015 | Concluded | Jamie Cleveland (Inactive) | 6/30/2015 11:45:54 AM |
Description: Review the newly-revised guidance & template for your RME Technical Report. BPA Fish and Wildlife project sponsors who have the following work elements in their contracts are required to complete a RM&E technical report: 156 Develop RM&E Methods and Designs, 157 Collect/Generate/Validate Field and Lab Data, 158 Mark and Tag Animals, and/or 162 Analyze/Interpret Data. Reports must show cumulative results and synthesis for the duration data collection/analysis studies. | |||||||
B | RMET2 | RM&E Technical: Upload draft RM&E Technical Report (MS Word) for BPA review | 1/5/2016 | 1/31/2016 | Concluded | Ian Tattam | 6/5/2015 3:09:36 PM |
Description: Upload your draft RM&E report into the Pisces Attachments tab as an MS Word document as a "Technical, Draft" for BPA review. BPA will review the draft RM&E report. If your Word file is too big to be uploaded, contact fish support. For more information on structure and content of your report, please use the newly-revised guidance & template for RME Reports located at https://www.cbfish.org/Help.mvc/GuidanceDocuments. (Milestone start/end: September 15 - January 15). | |||||||
C | IntRev | Distribute Progress Report for Internal Contractor Review | 12/5/2015 | 12/20/2015 | Concluded | Ian Tattam | 6/5/2015 3:09:36 PM |
Description: Internal review will be conducted by Jim Ruzycki before being reviewed externally or being uploaded. | |||||||
D | DELIV | RM&E Technical Report | 1/31/2016 | Concluded | Jamie Cleveland (Inactive) | 6/30/2015 2:28:40 PM | |
Description: Final RM&E Technical Report for Calendar Year 2015 (1/1/15 - 12/31/15) uploaded to the BPA reports web site. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1768. Start date of reporting period | 1/1/2015 | 1/1/2015 | |||
1769. End date of reporting period | 12/31/2015 | 12/31/2015 |