2003-017-00 EXP ISEMP BIO MARK SALMON R PIT TAG INSTALL
Contract Start Date:
6/15/2010
Contract End Date:
9/30/2011
Title:
E: 70 - Install tandem PIT tag array Joseph Creek
Description:
Biomark will construct eight 20 foot (6.1 meter) flat panel antennas. Antennas will be installed by Biomark into Joseph Creek. The contract funds two fully operational and tuned PIT tag arrays, each consisting of one FS1001M transceiver, transceiver enclosure, data logger, satellite remote communication infrastructure, a model 5060 thermoelectric generator to power the array, and propane tanks and manifolds. Also included is the remote communications infrastructure, shipping, installation hardware, and installation equipment rental.

Deliverables also include a report of the following performance metrics:
1. Noise values for each antenna at 100% noise gain prior to and immediately following installation.
2. Current draw for each antenna prior to and immediately following installation.
3. Capacitor value for each antenna prior to and immediately following installation.
4. Virtual test tag value that results in greater than 50% read rate.
5. Actual maximum read distance for SST PIT tags in pass-by orientation in Biomark’s screened radio-frequency and immediately following installation.
6. Observed efficiency (fraction of positive detections) when a PIT tag is passed at a distance of 15 inches and 18 inches from the antenna coil.
WE Agreement Type:
Contracted
Deliverable Specification:
Joseph Creek PIT tag array is installed and fully functional, including remote communications.
WSE Effective Budget:
$263,208
% of Total WSE Effective Budget:
14.06%
WSE Start:
06/15/2010
WSE End:
12/01/2010
WSE Completion:
12/01/2010
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 48304 (06/15/2010 - 09/30/2011) $263,208 $263,208
Work Element Budget (Current Performance Period) $263,208 $263,208

6 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 6/15/2010 8/2/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Engineering/design 6/15/2010 6/18/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: Site visit to evaluate cable lengths and determine optimal antenna configurations.
C Purchase, fabrication & construction 6/21/2010 7/30/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: Fabricate antennas, enclosures, and communications equipment.
D Testing, calibration, & installation/ on-site 8/2/2010 11/5/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: Installation and test equipment on-site
E Deliverable completed: in-place and fully functional 9/1/2010 12/1/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: Install array during low-flow (July through November).
F DELIV Install tandem PIT tag array Joseph Creek. 12/1/2010 Concluded David Byrnes (Inactive) 2/18/2011 9:30:21 AM
Description: Joseph Creek PIT tag array is installed and fully functional, including remote communications.

Implementation Metrics
None

Work Site ID Latitude Longitude State County Province Subbasin
22250 46.040725 -117.002542 Washington Asotin Blue Mountain Grande Ronde

Primary Focal Species:
Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)

This work element does not require RM&E metadata