2003-017-00 EXP ISEMP BIO MARK SALMON R PIT TAG INSTALL
Contract Start Date:
6/15/2010
Contract End Date:
9/30/2011
Title:
K: 70 - Install tandem PIT tag array Lolo Creek
Description:
Biomark will construct twelve 20 foot (6.1 meter) flat panel antennas. Antennas will be installed by Biomark into the Lolo Creek. The contract funds two fully operational and tuned PIT tag arrays, each consisting of one FS1001M transceiver, transceiver enclosure, data logger, satellite remote communication infrastructure, a model 5060 hybrid thermoelectric generator to power the array, and propane tanks and manifolds. Also included is the remote communications infrastructure, shipping, installation hardware, and installation equipment rental.


Deliverables also include a report of the following performance metrics:
1. Noise values for each antenna at 100% noise gain prior to and immediately following installation.
2. Current draw for each antenna prior to and immediately following installation.
3. Capacitor value for each antenna prior to and immediately following installation.
4. Virtual test tag value that results in greater than 50% read rate.
5. Actual maximum read distance for SST PIT tags in pass-by orientation in Biomark’s screened radio-frequency and immediately following installation.
6. Observed efficiency (fraction of positive detections) when a PIT tag is passed at a distance of 15 inches and 18 inches from the antenna coil.
WE Agreement Type:
Contracted
Deliverable Specification:
Lolo Creek PIT tag array is installed and fully functional, including remote communications.
WSE Effective Budget:
$294,300
% of Total WSE Effective Budget:
15.72%
WSE Start:
03/15/2011
WSE End:
09/30/2011
WSE Completion:
WSE Progress:
Other
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $294,300 $294,300

6 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 3/15/2011 3/28/2011 Concluded Christopher Beasley (Inactive) 3/15/2011 7:26:28 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B Suggested Engineering/design 3/21/2011 3/25/2011 Active Brian Beckley 3/14/2011 9:03:48 AM
Description: Engineering and Design Systems
C Suggested Purchase, fabrication, construction, and/or installation of the equipment or facility 3/28/2011 4/29/2011 Active Brian Beckley 3/14/2011 9:04:48 AM
Description: Fabricate antennas, enclosures, and communications equipment.
D Suggested Testing, calibration, modification 5/1/2011 5/31/2011 Active Brian Beckley 3/14/2011 9:05:24 AM
Description: Installation and test equipment on-site
E Suggested Deliverable completed: in-place and fully functional 6/1/2011 9/30/2011 Active Brian Beckley 3/14/2011 9:06:10 AM
Description: Install array during low-flow (June - September).
F DELIV Install tandem PIT tag array Lolo Creek 9/30/2011 Active Brian Beckley 3/14/2011 9:01:25 AM
Description: Lolo Creek PIT tag array is installed and fully functional, including remote communications.

Implementation Metrics
None

Work Site ID Latitude Longitude State County Province Subbasin
25179 46.29042 -115.93397 Idaho Idaho Mountain Snake Clearwater

Primary Focal Species:
Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)