This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 55189 (11/01/2011 - 12/31/2012) | $1,500 | $1,500 | ||
Work Element Budget (Current Performance Period) | $1,500 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 11/1/2011 | 11/30/2011 | Concluded | Dorothy Welch | 9/19/2012 4:44:43 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA). | |||||||
B | DELIV | Installation of 5-8 Staff Gauges on Horseshoe Lake and Little Willamette properties | 11/30/2011 | Concluded | Dorothy Welch | 9/19/2012 4:44:43 PM | |
Description: The 5-8 gauges will be fixed in pre-selected locations and installed in early fall 2011. They will be similar in design to previously installed gauges at Harkens Lake. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1450. Are the measuring devices portable or fixed? | Fixed | Fixed | |||
1502. Type of metering device primarily used | Electronic, Data Read On-Site | Other | Staff gauges are manually read sticks |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
26352 | 44.606571 | -123.175396 | Oregon | Linn | Lower Columbia | Willamette |
26353 | 44.622213 | -123.154453 | Oregon | Linn | Lower Columbia | Willamette |