I: 132 - Combined Annual report of all ISEMP participants
Description:
Produce a report covering the work under this contract for the period from July 2012 through June 2013. Identifying proposed actions, accomplishments, and lessons learned. Additionally, for the previous 3 months, a similar format will be expected. The fourth 3-month report will be replaced by the Annual Report.
WE Agreement Type:
Contracted
Deliverable Specification:
Formatting and content requirements can be found at: https://efw.bpa.gov/Integrated_Fish_and_Wildlife_Program/ReportingGuidelines.pdf
Final versions of annual/technical reports should be submitted electronically, preferably as a portable document format (PDF) file, in one of the following ways:
Upload on-line (60MB maximum file size). The form with instructions for uploading files is located at: https://efw.bpa.gov/cgi-bin/FW/publications.cgi.
Copy to a CD or other portable storage device for mail or hand delivery (recommended for non-PDF files and documents over 60MB).
Attach to an email (for documents under 5MB).
Other periodic reports (monthly, quarterly, etc.) should be submitted either by email or, for large documents, by CD.

Upload the final approved annual report to the BPA web site. This now requires a Pisces login and password to accomplish. Please register online if not already accomplished.
WSE Effective Budget:
$2,500
% of Total WSE Effective Budget:
1.68%
WSE Start:
12/01/2012
WSE End:
06/30/2013
WSE Completion:
06/30/2013
WSE Progress:
Concluded
WSE ID Continued From:
[Unassigned]
WSE ID Continued To:
[Unassigned]
Finite or Recurring:
Finite

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 46273 REL 48 (07/01/2012 - 06/30/2013) $2,500 $2,500
Work Element Budget (Current Performance Period) $2,500 $2,500

7 Milestones
Sort Type Title Start End Status Modified By Modified Date
A Annual progress reporting 1/1/2013 2/28/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: Annual progress report to ISEMP project leads on all project components.
B Receive comments from BPA COTR on FY12 report 3/1/2013 3/15/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: BPA COTR should provide comments within 15 days of receiving a draft annual report.
C Submit final FY12 report to BPA for approval 4/1/2013 4/1/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: Within 15 days of receiving draft annual report comments from the COTR, the contractor shall submit a revised FINAL version to BPA.
D Receive approval for upload of FY12 report to BPA web site 5/1/2013 5/1/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: Receive final approval of annual report from BPA COTR before loading report to BPA web site per deliverable specifications.
E NonT1 Review progress report format requirements 12/1/2012 12/31/2012 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: Contractor must review formatting requirements before starting the first draft of their report. Please follow the BPA-required format. https://efw.bpa.gov/IntegratedFWP/technicalreports.aspx
F DELIV Confirm BPA has posted the progress report 6/15/2013 6/15/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: It usually takes BPA 30-45 days to post the final version of a report. This milestone's end date should therefore be 45 days after the Deliverable milestone. You will receive an email from BPA confirming that your report has been finalized and posted to the web.
G DELIV Final Approved Annual Report uploaded to BPA web site 6/30/2013 Concluded David Byrnes (Inactive) 2/12/2013 11:13:58 AM
Description: Formatting and content requirements can be found at: https://efw.bpa.gov/Integrated_Fish_and_Wildlife_Program/ReportingGuidelines.pdf Final versions of annual/technical reports should be submitted electronically, preferably as a portable document format (PDF) file, in one of the following ways: Upload on-line (60MB maximum file size). The form with instructions for uploading files is located at: https://efw.bpa.gov/cgi-bin/FW/publications.cgi. Copy to a CD or other portable storage device for mail or hand delivery (recommended for non-PDF files and documents over 60MB). Attach to an email (for documents under 5MB). Other periodic reports (monthly, quarterly, etc.) should be submitted either by email or, for large documents, by CD. Upload the final approved annual report to the BPA web site. This now requires a Pisces login and password to accomplish. Please register online if not already accomplished.

Implementation Metrics
Metric Planned Actual Contractor Comments Measures HLIs
1768. Start date of reporting period 7/1/2012 7/1/2012
1769. End date of reporting period 6/30/2013 6/30/2013

This work element does not require Focal Species
This work element does not require Environmental Compliance
This work element does not require RM&E metadata