This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 46273 REL 48 (07/01/2012 - 06/30/2013) | $2,500 | $2,500 | ||
Work Element Budget (Current Performance Period) | $2,500 | $2,500 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | Annual progress reporting | 1/1/2013 | 2/28/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM | |
Description: Annual progress report to ISEMP project leads on all project components. | |||||||
B | Receive comments from BPA COTR on FY12 report | 3/1/2013 | 3/15/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM | |
Description: BPA COTR should provide comments within 15 days of receiving a draft annual report. | |||||||
C | Submit final FY12 report to BPA for approval | 4/1/2013 | 4/1/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM | |
Description: Within 15 days of receiving draft annual report comments from the COTR, the contractor shall submit a revised FINAL version to BPA. | |||||||
D | Receive approval for upload of FY12 report to BPA web site | 5/1/2013 | 5/1/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM | |
Description: Receive final approval of annual report from BPA COTR before loading report to BPA web site per deliverable specifications. | |||||||
E | NonT1 | Review progress report format requirements | 12/1/2012 | 12/31/2012 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM |
Description: Contractor must review formatting requirements before starting the first draft of their report. Please follow the BPA-required format. https://efw.bpa.gov/IntegratedFWP/technicalreports.aspx | |||||||
F | DELIV | Confirm BPA has posted the progress report | 6/15/2013 | 6/15/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM |
Description: It usually takes BPA 30-45 days to post the final version of a report. This milestone's end date should therefore be 45 days after the Deliverable milestone. You will receive an email from BPA confirming that your report has been finalized and posted to the web. | |||||||
G | DELIV | Final Approved Annual Report uploaded to BPA web site | 6/30/2013 | Concluded | David Byrnes (Inactive) | 2/12/2013 11:13:58 AM | |
Description: Formatting and content requirements can be found at: https://efw.bpa.gov/Integrated_Fish_and_Wildlife_Program/ReportingGuidelines.pdf Final versions of annual/technical reports should be submitted electronically, preferably as a portable document format (PDF) file, in one of the following ways: Upload on-line (60MB maximum file size). The form with instructions for uploading files is located at: https://efw.bpa.gov/cgi-bin/FW/publications.cgi. Copy to a CD or other portable storage device for mail or hand delivery (recommended for non-PDF files and documents over 60MB). Attach to an email (for documents under 5MB). Other periodic reports (monthly, quarterly, etc.) should be submitted either by email or, for large documents, by CD. Upload the final approved annual report to the BPA web site. This now requires a Pisces login and password to accomplish. Please register online if not already accomplished. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1768. Start date of reporting period | 7/1/2012 | 7/1/2012 | |||
1769. End date of reporting period | 6/30/2013 | 6/30/2013 |