Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
1998-016-00 EXP IMPLEMENT EMAP IN JOHN DAY SUBBASIN
Contract Start Date:
10/1/2013
Contract End Date:
9/30/2014
Title:
B: 157 - Steelhead Spawner Surveys
Description:
Conduct steelhead spawning ground surveys to estimate steelhead escapement for a single population in the John Day River basin.

Adult steelhead redd surveys will be conducted from March 1 - June 25 annually based on standard ODFW methods for conducting steelhead redd surveys (Susac and Jacobs, 1999; Jacobs et al., 2000; Jacobs et al., 2001). Twenty to thirty sites will be selected and are visited every two weeks throughout the season to quantify the cumulative redd count at each site. Surveyors will sample upstream from the downstream end of each survey reach. Each surveyor counts live fish and determines the fin-mark status of all live fish through observations. All redds are counted and flagged. A representative subsample reach will be visited at a greater frequency to validate bi-weekly redd enumeration. Redds with spawners present will also be measured to develop a database of redd size for each life history strategy.
WE Agreement Type:
Contracted
Deliverable Specification:
Steelhead Spawner Survey Data collected and included in Annual Report to BPA.
WSE Effective Budget:
$180,000
% of Total WSE Effective Budget:
28.79%
WSE Start:
10/01/2013
WSE End:
07/31/2014
WSE Completion:
07/11/2014
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
Work Element Budget (Current Performance Period) $180,000 $180,000

5 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 10/1/2013 2/14/2014 Concluded James Ruzycki 8/19/2013 4:58:36 PM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
B PUBPROTOCOL Review, revise, and Publish protocol, study design, and methods in monitoringmethods.org 11/1/2013 1/31/2014 Concluded James Ruzycki 8/19/2013 4:58:36 PM
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at monitoringmethods.org and need to be finalized (i.e., "Published" through monitoringmethods.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract.
C Refine Geographic Database 10/5/2013 12/31/2013 Concluded James Ruzycki 8/19/2013 5:00:59 PM
Description: Georeference locations in GIS format of all observed redds.
D Conduct Surveys of Stream Reaches 2/25/2014 6/28/2014 Concluded Jamie Cleveland (Inactive) 9/20/2013 12:11:07 PM
Description: Conduct up to 30, 2-km surveys of steelhead redds and spawners drawn from one steelhead population distribution using probabalistic sampling design. The final number of sites will be determined by logistical constraints including travel distance and remoteness of access points.
E DELIV Steelhead Spawner Surveys 7/31/2014 Concluded James Ruzycki 8/20/2013 8:43:20 AM
Description: Steelhead Spawner Survey Data collected and included in Annual Report to BPA.

Work Site ID Latitude Longitude State County Province Subbasin
29771 44.754036 -119.638898 Oregon Grant Columbia Plateau John Day
29772 44.473469 -119.535 Oregon Grant Columbia Plateau John Day

Primary Focal Species:
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
Secondary Focal Species:
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU; Lamprey, Pacific (Entosphenus tridentata); Trout, Interior Redband (O. mykiss gairdnerii)

Title Link
Middle Fork (John Day) Intensively Monitored Watershed Reports http://www.middleforkimw.org/publications.html
NOAA Salmon Population Summary (SPS) Database https://www.webapps.nwfsc.noaa.gov/apex/f?p=261:home:0
ODFW NRIMP (Natural Resources Information Management Program) https://nrimp.dfw.state.or.us/nrimp/default.aspx?p=259
ODFW Salmon & Steelhead Recovery Tracker http://odfwrecoverytracker.org/
ODFW's Data Clearinghouse https://nrimp.dfw.state.or.us/DataClearinghouse/default.aspx?p=1
Study Plan Name Study Plan Owner Protocol State Sample Design Name
Estimating Abundance of Adult Summer Steelhead in the John Day Basin v1.0 Ian Tattam Draft Steelhead spawner surveys - Oregon Department of Fish and Wildlife: John Day - Version 1 v1.0

ID Name Type Optional Customized Based On Status
107 Carcass Count: Survey v1.0 Data Collection No N/A Finalized
402 Fish per redd v1.0 Data Analysis/Interpretation No N/A Finalized
131 Redd Count Survey v1.0 Data Collection No N/A Finalized
285 Spawning Survey-Redds v1.0 Data Collection No N/A Finalized
286 Spawning Survey-Spawners v1.0 Data Collection No N/A Finalized

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Hatchery vs Wild Observations Fish Abundance of Fish (ID: 46) Fish Life Stage: Adult - Spawner Fish Origin: Both
Spawner Escapement Estimates By Hatchery or Wild Origin Fish Abundance of Fish (ID: 46) Fish Life Stage: Adult - Spawner Fish Origin: Both
Number of Observed Steelhead Redds Fish Spawning/Nesting (ID: 507) Fish Origin: Both NA
Redd Density Fish Spawning/Nesting (ID: 507) Fish Origin: Both NA