A | 165 | Produce Environmental Compliance Documentation | Produce environmental compliance documentation | Produce environmental compliance documentation. | |||
B | 119 | Manage and Administer Projects | Manage and administer contract | Manage and administer contract | |||
C | 30 | Realign, Connect, and/or Create Channel | Improve connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres | Improve connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres and increase the frequency of seasonal inundation between October and July. | Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened), Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened), Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened), Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations, Lamprey, Pacific (Entosphenus tridentata), Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) | ||
D | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | |||
E | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period 9/25/15 - 9/24/16 | The progress report summarizes the project goal, objectives, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. Non-technical Progress Reports must conform to BPA guidelines. See the "Non-technical Progress Report" link at: https://www.cbfish.org/Help.mvc/GuidanceDocuments. |