Show new navigation
On
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 70521: 2009-012-00 EXP CLACKAMAS RIVER CONFLUENCE RESTORATION
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
70521
Contract Title:
2009-012-00 EXP CLACKAMAS RIVER CONFLUENCE RESTORATION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The project is located on 9.3 acres of Dahl Beach Park at the confluence of the Clackamas and Willamette rivers at river miles 24-25. CRBC will excavate and re-grade two interior basins and place large wood at the inlet. The project will address key limiting factors identified in the Upper Willamette and Lower Columbia River Conservation and Recovery Plans. The project will provide important off-channel habitat for spring/fall Chinook, Coho, and winter steelhead.
Account Type(s):
Expense
Contract Start Date:
09/25/2015
Contract End Date:
09/24/2016
Current Contract Value:
$85,383
Expenditures:
$85,383

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Marker
5 m
10 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Steven Gagnon Bonneville Power Administration Yes COR skgagnon@bpa.gov (503) 230-3375
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Amy Mai Bonneville Power Administration Yes Interested Party aemai@bpa.gov (503) 230-7349
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Cheryl McGinnis Clackamas River Basin Council Yes Contract Manager cheryl@clackamasriver.org (503) 303-4372
Justin Moffett Bonneville Power Administration Yes Env. Compliance Lead jtmoffett@bpa.gov (503) 230-3233


Viewing 5 of 5 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A143606165Produce Environmental Compliance DocumentationProduce environmental compliance documentationProduce environmental compliance documentation.$2,5562.99%09/25/201509/24/2016
B143605119Manage and Administer ProjectsManage and administer contractManage and administer contract$2,5562.99%09/25/201509/24/2016
C14360930Realign, Connect, and/or Create ChannelImprove connectivity to the mainstem Clackamas River on 1.2 forested floodplain acresImprove connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres and increase the frequency of seasonal inundation between October and July.$75,15988.03%09/25/201508/31/2016
D143604185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$2,5562.99%01/01/201609/24/2016
E143607132Produce Progress (Annual) ReportSubmit Progress Report for the period 9/25/15 - 9/24/16The progress report summarizes the project goal, objectives, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. Non-technical Progress Reports must conform to BPA guidelines. See the "Non-technical Progress Report" link at: https://www.cbfish.org/Help.mvc/GuidanceDocuments.$2,5562.99%08/15/201609/24/2016
      
$85,383
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Produce environmental compliance documentation A: 165. Produce environmental compliance documentation 09/24/2016 10/07/2015
All administrative tasks fulfilled with timely quality products B: 119. Manage and administer contract 09/24/2016 09/24/2016
Improve connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres C: 30. Improve connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres 08/31/2016 07/28/2016
Progress Report has been published E: 132. Submit Progress Report for the period 9/25/15 - 9/24/16 09/24/2016 09/24/2016

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce environmental compliance documentation 04/01/2015
B 119 Manage and administer contract 04/01/2015
C 30 Improve connectivity to the mainstem Clackamas River on 1.2 forested floodplain acres 07/27/2016
D 185 Periodic Status Reports for BPA 04/01/2015
E 132 Submit Progress Report for the period 9/25/15 - 9/24/16 04/01/2015