| | | | | | | | | | | | |
---|
A | 165 | Produce Environmental Compliance Documentation | 6.10b Environmental Compliance | Ensure necessary documents are provided to BPA's Environmental Compliance group in sufficient time to allow for a compliance letter to be written prior to any ground-disturbing work. Coordinate with appropriate agencies regarding any permits that may be required. | A | DELIV | Environmental Compliance supporting documentation | | 07/01/2007 | Concluded | Pamela Nelle | 05/30/2007 4:47 PM |
B | 189 | Coordination-Columbia Basinwide | 6.1 ISEMP Wenatchee/Entiat Coordination | Terraqua will represent the interests of the ISEMP at meetings of the RTT, the Entiat Watershed Planning Unit, and the mid-Columbia PUD's HCP Hatchery Committee, and will coordinate electronically and in-person with the following entities that may be involved in this Program: RTT, EWPU, U.S. Forest Service (USFS), Washington Department of Ecology (WDOE), Chelan PUD, Yakama Nation, NOAA-Fisheries, BPA, U.S. Bureau of Reclamation, Chelan County, Chelan County Conservation District, and other parties as necessary.
Terraqua will coordinate ISEMP contractors to help insure that contractors SOWs and deliverables meet ISEMP needs and that contractor budgets stay within the overall ISEMP budget and other available funds. Terraqua will also coordinate the analysis and reporting of ISEMP products with Quantitative Consultants, NOAA, and other program analysts. | A | | Submit RTT Meeting minutes | 07/01/2007 | 06/30/2008 | Concluded | Michael Ward (Inactive) | 05/28/2007 4:28 PM |
B | 189 | Coordination-Columbia Basinwide | 6.1 ISEMP Wenatchee/Entiat Coordination | Terraqua will represent the interests of the ISEMP at meetings of the RTT, the Entiat Watershed Planning Unit, and the mid-Columbia PUD's HCP Hatchery Committee, and will coordinate electronically and in-person with the following entities that may be involved in this Program: RTT, EWPU, U.S. Forest Service (USFS), Washington Department of Ecology (WDOE), Chelan PUD, Yakama Nation, NOAA-Fisheries, BPA, U.S. Bureau of Reclamation, Chelan County, Chelan County Conservation District, and other parties as necessary.
Terraqua will coordinate ISEMP contractors to help insure that contractors SOWs and deliverables meet ISEMP needs and that contractor budgets stay within the overall ISEMP budget and other available funds. Terraqua will also coordinate the analysis and reporting of ISEMP products with Quantitative Consultants, NOAA, and other program analysts. | B | | Monthly, telephonically update COTR of significant coordination issues | 07/01/2007 | 06/30/2008 | Concluded | Michael Ward (Inactive) | 05/28/2007 4:28 PM |
B | 189 | Coordination-Columbia Basinwide | 6.1 ISEMP Wenatchee/Entiat Coordination | Terraqua will represent the interests of the ISEMP at meetings of the RTT, the Entiat Watershed Planning Unit, and the mid-Columbia PUD's HCP Hatchery Committee, and will coordinate electronically and in-person with the following entities that may be involved in this Program: RTT, EWPU, U.S. Forest Service (USFS), Washington Department of Ecology (WDOE), Chelan PUD, Yakama Nation, NOAA-Fisheries, BPA, U.S. Bureau of Reclamation, Chelan County, Chelan County Conservation District, and other parties as necessary.
Terraqua will coordinate ISEMP contractors to help insure that contractors SOWs and deliverables meet ISEMP needs and that contractor budgets stay within the overall ISEMP budget and other available funds. Terraqua will also coordinate the analysis and reporting of ISEMP products with Quantitative Consultants, NOAA, and other program analysts. | C | DELIV | Meeting minutes / Coordination reports | | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:15 PM |
C | 174 | Produce Plan | 6.2 Implementation Tracking Tool | Terraqua will continue to maintain and update the Project Tracking Tool developed in 2005-2006 that serves to document changes to scientific study design that have occurred since the inception of ISEMP to assist project contractors in conducting field work and to assist ISEMP analysts in the interpretation of project data. This database will continue to be a "living" tool that will be periodically updated as necessary and will be electronically accessible to all ISEMP contractors and cooperators. This document will be updated and maintained in working draft format through June 30, 2008 (and presumably thereafter by Terraqua or subsequently contracted project coordinators). | A | | Maintain working draft of project tracking tool with periodic updates | 07/01/2007 | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:04 PM |
C | 174 | Produce Plan | 6.2 Implementation Tracking Tool | Terraqua will continue to maintain and update the Project Tracking Tool developed in 2005-2006 that serves to document changes to scientific study design that have occurred since the inception of ISEMP to assist project contractors in conducting field work and to assist ISEMP analysts in the interpretation of project data. This database will continue to be a "living" tool that will be periodically updated as necessary and will be electronically accessible to all ISEMP contractors and cooperators. This document will be updated and maintained in working draft format through June 30, 2008 (and presumably thereafter by Terraqua or subsequently contracted project coordinators). | B | DELIV | Implementation of Tracking Tool | | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:03 PM |
C | 174 | Produce Plan | 6.2 Implementation Tracking Tool | Terraqua will continue to maintain and update the Project Tracking Tool developed in 2005-2006 that serves to document changes to scientific study design that have occurred since the inception of ISEMP to assist project contractors in conducting field work and to assist ISEMP analysts in the interpretation of project data. This database will continue to be a "living" tool that will be periodically updated as necessary and will be electronically accessible to all ISEMP contractors and cooperators. This document will be updated and maintained in working draft format through June 30, 2008 (and presumably thereafter by Terraqua or subsequently contracted project coordinators). | C | | Provide accessibility to the tracking tool | 07/01/2007 | 03/15/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:27 PM |
D | 160 | Create/Manage/Maintain Database | 6.3 Data Management System Development | The U.S. Bureau of Reclamation (USBR) and NOAA-Fisheries are continuing to develop a data management system to guide and capture data collected by ISEMP contractors. Terraqua will continue to serve as technical liaison between ISEMP contractors and this system's developers to ensure that the final data management system serves the ISEMP as implemented in the Upper Columbia basin. Terraqua will represent the interests of the Project at development meetings held by NOAA-Fisheries and USBR and will coordinate electronically and in-person with these and other entities that are developing the data management systems related to Project #2003-017-00. | A | | Submit summary of data management system development at project mid-point | 07/01/2007 | 12/31/2007 | Concluded | Pamela Nelle | 05/30/2007 1:51 PM |
D | 160 | Create/Manage/Maintain Database | 6.3 Data Management System Development | The U.S. Bureau of Reclamation (USBR) and NOAA-Fisheries are continuing to develop a data management system to guide and capture data collected by ISEMP contractors. Terraqua will continue to serve as technical liaison between ISEMP contractors and this system's developers to ensure that the final data management system serves the ISEMP as implemented in the Upper Columbia basin. Terraqua will represent the interests of the Project at development meetings held by NOAA-Fisheries and USBR and will coordinate electronically and in-person with these and other entities that are developing the data management systems related to Project #2003-017-00. | B | DELIV | Summary of data management system | | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:15 PM |
E | 189 | Coordination-Columbia Basinwide | 6.4 ISEMP Program Coordination | Implementation of the Project among the three pilot subbasins, particularly in the area of data management, analysis, reporting, and dissemination of information to other users in the Columbia Basin and states of OR, ID, and WA, requires close coordination of numerous entities who are participating in the Project. Terraqua will represent the interests of the Project at meetings of the pilot subbasin coordinators and will coordinate electronically and in-person with these coordinators and other entities that are developing data management systems, analysis, reporting, and document/conference preparation materials related to Project #2003-017-00. | A | | Attend program coordination meetings | 07/01/2007 | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:19 PM |
E | 189 | Coordination-Columbia Basinwide | 6.4 ISEMP Program Coordination | Implementation of the Project among the three pilot subbasins, particularly in the area of data management, analysis, reporting, and dissemination of information to other users in the Columbia Basin and states of OR, ID, and WA, requires close coordination of numerous entities who are participating in the Project. Terraqua will represent the interests of the Project at meetings of the pilot subbasin coordinators and will coordinate electronically and in-person with these coordinators and other entities that are developing data management systems, analysis, reporting, and document/conference preparation materials related to Project #2003-017-00. | B | DELIV | Meeting minutes | | 06/30/2008 | Concluded | Michael Ward (Inactive) | 06/17/2007 12:19 PM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | A | | Revise and update fish capture/PIT tagging protocol | 09/01/2007 | 04/30/2008 | Concluded | Pamela Nelle | 05/31/2007 10:37 AM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | B | | Revise and update habitat survey protocol | 12/01/2007 | 04/30/2008 | Concluded | Pamela Nelle | 05/30/2007 2:43 PM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | C | | First draft of efficiency trial protocol | 07/01/2007 | 11/30/2007 | Concluded | Michael Ward (Inactive) | 06/01/2007 3:51 PM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | D | | Final working draft of efficiency trial protocol | 11/01/2007 | 02/15/2008 | Concluded | Pamela Nelle | 05/30/2007 2:43 PM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | E | | First draft of redd survey protocol | 07/01/2007 | 12/15/2007 | Concluded | Michael Ward (Inactive) | 06/01/2007 3:51 PM |
F | 174 | Produce Plan | 6.5 Protocol Development | Terraqua will coordinate the development of working draft scientific protocols suitable to describe field and data management methodologies for several methodologies implemented by ISEMP in the Wenatchee/Entiat. These include updating existing protocols for habitat surveys and fish capture and tagging, and also includes new protocols for: fine sediment, water quality, snorkel, redd surveys, smolt trapping, macroinvertebrates sampling, site selection, efficiency trials, and fish capture/pit tagging. Terraqua will collate methodologies provided by ISEMP contractors, will provide descriptions of proper data management for each protocol that matches the needs of each protocol's ATM data management tool, and will produce a working draft document for each protocol.
Completion of this work element will require substantial input from ISEMP contractors and ISEMP data managers. | F | | Final working draft of redd survey protocol | 11/01/2007 | 02/15/2008 | Concluded | Pamela Nelle | 05/30/2007 2:43 PM |
| | | | | | | | | | | | |