SOW Report
Contract 54644: 1999-003-01 EXP PSMFC CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Project Number:
Title:
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Mainstem Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
54644
Contract Title:
1999-003-01 EXP PSMFC CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Continuation:
Previous: Next:
49534: 1999-03-01 EXP PSMFC CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
  • 59478: 1999-003-01 EXP PSMFC CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Status:
Closed
Contract Description:
PROJECT TITLE: Evaluate mainstem Columbia River spawning of Chinook salmon below Bonneville Dam.  This contract augments the WDFW Chum focus project 2008-710-00.  There is no annual progress report for this contract because all the data collected will be incorporated into the WDFW Project 2008-710-00 contract annual progress report,

PROJECT GOAL:  The continuing purpose of this on-going project is to assess the extent of spawning by ESA-listed Lower Columbia River Chinook salmon in the mainstem Columbia River so that the Federal Columbia River Power System (FCRPS) can be managed to protect and enhance these important populations.  Our primary focus is to determine what conditions must exist to provide successful spawning and rearing below Bonneville Dam and what measures must be taken to protect those fish.

PROJECT OBJECTIVES:  Continued implementation of this project will result in an...  improved understanding of the relationship between operation of the FCRPS and protection of mainstem spawning salmon populations.  Funding will allow continued in-season management of the hydro-system, reducing harm to mainstem spawning and incubation.  We have developed a series of tasks designed to inform regional fish managers regarding status and trends of mainstem spawning populations of Chinook salmon.  These tasks will allow us to collect and report on abundance and productivity metrics and spatial structure that are essential for describing population viability and trends in abundance.  They will further the understanding of the spawning habitat requirements for these fish, especially as they relate to hydro-system operation.  

PROJECT OBJECTIVE 1 - Chinook Spawning Ground Surveys in mainstem

PROJECT OBJECTIVE 2 - Describe Chinook spawning population characteristics in the mainstem

PROJECT OBJECTIVE 3 - Chinook Salmon Abundance Estimates TLE: Evaluate mainstem Columbia River spawning of Chinook salmon below Bonneville Dam.

Note:  All metrics/milestones of this project related to monitoring of chum salmon populations were transferred to BPA Project #2008-710-00 EXP CHUM HABITAT RESTORE SUPPLEMENT (CR-162633) in FFY 2011.
  
Account Type(s):
Expense
Contract Start Date:
10/01/2011
Contract End Date:
09/30/2012
Current Contract Value:
$12,867
Expenditures:
$12,867

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Marker
5 m
10 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 8 of 8 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A89040185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$3002.65%01/01/201209/30/2012
B89041157Collect/Generate/Validate Field and Lab DataChinook Salmon Spawning Ground Surveys in the mainstemWeekly, or bi-weekly, counts of redds and adult Chinook salmon (live and dead) in the mainstem Columbia River. Chinook redds will be identified using the following criteria: adult Chinook presence and size of redd. Location in stream as well as gravel size may also be considered. The study area includes sampling locations from river mile 144.5 (Ives/Pierce Island complex) to river mile 136.0 (near Multnomah Falls area). Data collected include: a) Redd counts, b) live and dead fish counts, and c) GPS locations of spawning areas or redds. Carcasses are examined for presence of tags and marks. The field season spans two contracting periods.$8,43974.42%10/01/201109/30/2012
C89042165Produce Environmental Compliance DocumentationNEPA and Endangered Species Act ComplianceReport catches per guidelines established in Scientific Research and Take Authorization (4d permit) and complete application as required for future field sampling. This work element is conducted in cooperation with PSMFC/WDFW, who apply for the annual permits and report take. Submit FY12 SOW and supporting documents as needed for BPA's Environmental Compliance Group to determine environmental compliance status.$3503.09%10/01/201109/30/2012
D89043161Disseminate Raw/Summary Data and ResultsChinook Salmon Spawning Ground Survey Data ExchangeSpawner survey data will be provided to the Fish Passage Center for dissemination to the region via the Fish Passage Center's Home page on a weekly basis for Chinook salmon. Field season spans two contracting periods.$8507.50%10/01/201109/30/2012
E89044162Analyze/Interpret DataDescribe Spawning Population Characteristics for Chinook Salmon in the Mainstem ColumDescribe average size at return by age and gender, gender ratios, and age composition of Chinook salmon naturally spawning in the mainstem Columbia below Bonneville Dam.$7006.17%01/31/201209/30/2012
F89045162Analyze/Interpret DataChinook Salmon Abundance EstimatesDetermine minimum population size of Chinook salmon in surveyed area.$5004.41%01/01/201209/30/2012
G89046119Manage and Administer ProjectsManage and administer Project 1999-003-01Covers work to manage on-the-ground efforts associated with the project. Also covers administrative work in support of on-the-ground efforts and in support of BPA's programmatic requirements such as financial reporting, and development of a SOW package (includes draft SOW, budget and property inventory).$2001.76%10/01/201109/30/2012
H94035132Produce Progress (Annual) ReportNo Progress Report for the period under this contractThe FY11 Annual Report will be provided in the new FY12 contract with WDFW, CR-202617, because this contract is just a small component of the spawning below the dams work being lead by WDFW. This is documented the new SOW with WDFW.$00.00%
      
$11,339
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Chinook Spawning Ground Surveys in mainstem B: 157. Chinook Salmon Spawning Ground Surveys in the mainstem 09/30/2012 09/30/2012
NEPA and Endangered Species Act Compliance C: 165. NEPA and Endangered Species Act Compliance 01/31/2012 01/31/2012
Chinook Salmon Spawning Ground Survey Data Exchange D: 161. Chinook Salmon Spawning Ground Survey Data Exchange 09/30/2012 09/30/2012
Describe Chinook spawning population characteristics in the mainstem E: 162. Describe Spawning Population Characteristics for Chinook Salmon in the Mainstem Colum 04/30/2012 04/30/2012
Chinook Salmon Abundance Estimates F: 162. Chinook Salmon Abundance Estimates 09/30/2012 09/30/2012
Complete all project/contract management requirements G: 119. Manage and administer Project 1999-003-01 09/30/2012 09/30/2012

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2011
B 157 Chinook Salmon Spawning Ground Surveys in the mainstem 10/01/2011
C 165 NEPA and Endangered Species Act Compliance 10/01/2011
D 161 Chinook Salmon Spawning Ground Survey Data Exchange 10/01/2011
E 162 Describe Spawning Population Characteristics for Chinook Salmon in the Mainstem Colum 10/01/2011
F 162 Chinook Salmon Abundance Estimates 10/01/2011
G 119 Manage and administer Project 1999-003-01 10/01/2011