Province | Subbasin | % |
---|---|---|
Lower Columbia | Willamette | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Stephanie Detwiler | McKenzie River Trust | No | Administrative Contact | stephanie@mckenzieriver.org | (541) 345-2799 |
Israel Duran | Bonneville Power Administration | No | Env. Compliance Lead | induran@bpa.gov | (503) 230-3967 |
Paul Krueger | Bonneville Power Administration | Yes | F&W Approver | pqkrueger@bpa.gov | (503) 230-5723 |
Joe Moll | McKenzie River Trust | Yes | Supervisor | jmoll@mckenzieriver.org | (541) 345-2799 |
Nicole Rutherford | Bonneville Power Administration | No | Interested Party | narutherford@bpa.gov | (503) 230-4320 |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
Chris Vogel | McKenzie River Trust | Yes | Contract Manager | cvogel@mckenzieriver.org | (541) 345-2799 |
Dorothy Welch | Bonneville Power Administration | Yes | COR | dwwelch@bpa.gov | (503) 230-5479 |
A | 95702 | 119 | Manage and Administer Projects | Manage and administer contract | Conduct all necessary contract administration. Acquire materials for habitat restoration projects that are consistent with the restoration plan. | $17,000 | 17.89% | 11/01/2011 | 09/30/2012 |
B | 94041 | 165 | Produce Environmental Compliance Documentation | Complete required environmental compliance | Comply with NEPA/ESA regulations. Obtain all necessary permits and complete all required consultation. | $6,000 | 6.32% | 11/01/2011 | 09/30/2012 |
C | 96350 | 174 | Produce Plan | Develop restoration plan | MRT will work with consulting engineers, hydrologists, landscape architects and biologists to develop a comprehensive restoration plan for the CARP site and Neck complex immediately downstream. At present, a portion of the levee system that MRT removed in 2010 still stands and prevents beneficial connection of the historic McKenzie River channel and the Willamette River high flows. Integrating the Neck into the CARP restoration design and analysis offers the most cost-effective way to ensure that aquatic species have both dependable ingress and egress to the 4 miles of off-channel habitats that the complex provides. | $70,000 | 73.68% | 11/01/2011 | 09/30/2012 |
D | 93658 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $2,000 | 2.11% | 01/01/2012 | 09/30/2012 |
E | 95689 | 132 | Produce Progress (Annual) Report | Submit Progress Report - this work element is not required | The restoration plan that will be developed through this contract will be submitted in lieu of a progress report. | $0 | 0.00% |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Contract management and administration | A: 119. Manage and administer contract | 09/30/2012 | 09/30/2012 | |
Receipt of environmental compliance clearance from BPA | B: 165. Complete required environmental compliance | 09/30/2012 | 09/30/2012 | |
Restoration Plan Design | C: 174. Develop restoration plan | 09/30/2012 | 09/30/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened) |
|
Cutthroat Trout, Coastal (O. c. clarkii) - Upper Willamette River ESU |
|
Chub, Oregon (Oregonichthys crameri) (Endangered through FY2015) |
|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Manage and administer contract | 09/26/2011 | ||||||
B | 165 | Complete required environmental compliance | 09/26/2011 | ||||||
C | 174 | Develop restoration plan | 10/15/2011 | ||||||
D | 185 | Periodic Status Reports for BPA | 09/26/2011 | ||||||
E | 132 | Submit Progress Report - this work element is not required | 09/26/2011 |