Contract 71779: 2009-012-00 EXP LSNA FLOODPLAIN RECONNECTION DESIGN
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
71779
Contract Title:
2009-012-00 EXP LSNA FLOODPLAIN RECONNECTION DESIGN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The goal of this technical assistance (TA) project is to assess and identify the optimal floodplain reconnection opportunities at Luckiamute State Natural Area (LSNA).  A property of Oregon State Parks in the middle Willamette in Polk County, a preliminary hydrologic analysis conducted in 2013 identified the potential to increase the frequency and duration of inundation at the site, thus providing increased access to floodplain habitat for Upper Willamette Chinook, steelhead and other native fish. Based on Technical Review Team (TRT)  feedback, the project will begin with a "fish consultation" with the TRT and then a cost-benefit analysis of two specific sites on the Lower Luckiamute River. The project will also consider analyses of other floodplain opportunities. The analysis will consider cost-benefit of future potential restoration work and outline selected sites for future design and implementation. The project will also establis... h a monitoring framework and pre-restoration monitoring in coordination with U.S.G.S scientists and other partners and will conduct initial cultural resource assessments to inform future project planning.   
Account Type(s):
Expense
Contract Start Date:
03/01/2016
Contract End Date:
09/29/2017
Current Contract Value:
$39,992
Expenditures:
$39,992

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
50 km
50 mi
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 5 of 5 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A170139165Produce Environmental Compliance DocumentationReview NEPA/ESA/Cultural Resources RequirementsEnsure all environmental compliance requirements have been satisfied.$00.00%03/01/201612/30/2016
B170140185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$2240.56%07/01/201609/29/2017
C170141119Manage and Administer ProjectsEstablish subcontracts and oversee project tasks and coordinationCovers project management and administrative work related to the contract excluding environmental compliance.$6,26415.66%03/01/201609/29/2017
D170142174Produce PlanOpportunities for Floodplain Reconnection and Monitoring FrameworkConduct "fish consultation" with Technical Review Team as requested from proposal feedback. Conduct analysis of Site Implementation Areas (SIAs) 7 and 8 as outlined in River Design Group's preliminary Hydrologic Analysis. Consider if there are other floodplain opportunities as described in TRT review feedback. Conduct cost-benefit analysis of potential implementation areas and outline a plan for future design and implementation work based on analysis. Develop and document monitoring framework in coordination with USGS and partners and begin pre-restoration monitoring.$33,14582.88%03/01/201609/29/2017
E170143132Produce Progress (Annual) ReportSubmit Progress Report for the period (Mar 2016 - Feb 2017)The work that is completed under this contract will lead to the development of a restoration plan for the property. The restoration plan will be submitted in lieu of a progress report.$3590.90% 09/29/2017
      
$39,992
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation A: 165. Review NEPA/ESA/Cultural Resources Requirements 12/30/2016 12/30/2016
All administrative tasks fulfilled with timely quality products C: 119. Establish subcontracts and oversee project tasks and coordination 09/29/2017 09/29/2017
Final Restoration Plan and Monitoring Framework D: 174. Opportunities for Floodplain Reconnection and Monitoring Framework 09/14/2017 09/29/2017
Completed Annual Report E: 132. Submit Progress Report for the period (Mar 2016 - Feb 2017) 09/29/2017 09/29/2017

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
Cutthroat Trout, Coastal (O. c. clarkii) - Upper Willamette River ESU
  • 1 instance of WE 174 Produce Plan
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Review NEPA/ESA/Cultural Resources Requirements 01/01/2016
B 185 Periodic Status Reports for BPA 03/01/2016
C 119 Establish subcontracts and oversee project tasks and coordination 01/01/2016
D 174 Opportunities for Floodplain Reconnection and Monitoring Framework
E 132 Submit Progress Report for the period (Mar 2016 - Feb 2017) 02/01/2016