SOW Report
Contract 73548 REL 27: 2008-111-00 EXP TWIN LAKES ENHANCEMENT
Project Number:
Title:
Twin Lakes Enhancement
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
73548 REL 27
Contract Title:
2008-111-00 EXP TWIN LAKES ENHANCEMENT
Contract Continuation:
Previous: Next:
75981: 2008-111-00 EXP TWIN LAKES ENHANCEMENT
Contract Status:
History
Contract Description:
The Twin Lakes Enhancement Project evaluates the effectiveness of a hypolmnetic oxygenation restoration technique used to improve the trout fisheries.
Account Type(s):
Expense
Contract Start Date:
04/01/2018
Contract End Date:
03/31/2020
Current Contract Value:
$11,922
Expenditures:
$11,922

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarker
1 km
3000 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 7 of 7 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A194365185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$3335.56%07/01/201803/31/2020
B194366119Manage and Administer ProjectsManage and administer projectAdministration of this project includes planning SOW, financial supervision, coordination of all phases and contract supervision.$1,00016.69%04/01/201803/31/2019
C194367165Produce Environmental Compliance DocumentationProduce environmental complianceAll documents necessary for environmental compliance will be submitted to BPA.$1001.67%04/01/201803/31/2019
D194368157Collect/Generate/Validate Field and Lab DataMonitor physical and biological effects of oxygenationFrom 2008 to 2017, Colville Tribes Fish and Wildlife Department has worked with a team of scientists from Washington State University (WSU) to measure the effects of oxygenation on North Twin Lake using South Twin Lake as a reference. In 2018, the hypolimnetic oxygenation system will be shutdown because no evidence was found describing benefits to the fisheries after nine years of operation. However, physical and biological monitoring needs to continue in order to evaluate any potential negative impacts that may result from ending hypolimnetic oxygenation operations. Biological and nutrient data will be gathered throughout the open-water season to coincide with the existing data set.$5589.31%04/01/201803/31/2019
E194369162Analyze/Interpret DataAnalyze and interpret dataBiological and physical parameters will be compared to historical data and between lakes to decipher the effects of hypolimnetic oxygenation operations ending. Parameters to be analyzed consist of: dissolved oxygen levels, water quality variables, zooplankton abundance, and trout condition and growth (data obtained from a different project). Overall, the primary goal of the analysis is to determine if ending hypolimnetic oxygenation operation in North Twin Lake has negatively impacted the fisheries.$00.00%04/01/201803/30/2019
F194370132Produce Progress (Annual) ReportSubmit Progress Report for the period January 1, 2016 to December 31, 2016The progress report summarizes the project goal, objectives, hypotheses (for research), completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. RM&E Technical Progress reports must conform to BPA guidelines. See the "RME Technical Reporting" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments.$5008.35%04/01/201803/29/2019
G194371132Produce Progress (Annual) ReportSubmit Progress Report for the period January 1, 2017 to December 31, 2017The progress report summarizes the project goal, objectives, hypotheses (for research), completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. RM&E Technical Progress reports must conform to BPA guidelines. See the "RME Technical Reporting" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments.$3,50058.42%08/01/201803/31/2019
      
$5,991
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Manage and administer project 03/31/2019 03/31/2019
Completed Annual Report G: 132. Submit Progress Report for the period January 1, 2017 to December 31, 2017 03/31/2019 06/07/2018

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 04/01/2018
B 119 Manage and administer project 04/01/2018
C 165 Produce environmental compliance 04/01/2018
D 157 Monitor physical and biological effects of oxygenation 04/02/2018
E 162 Analyze and interpret data 04/01/2018
F 132 Submit Progress Report for the period January 1, 2016 to December 31, 2016 04/01/2018
G 132 Submit Progress Report for the period January 1, 2017 to December 31, 2017 04/01/2018