SOW Report
Contract 73778: 2009-012-00 EXP TURTLE FLATS/WILLAMETTE CONFLUENCE REFORESTATION
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
73778
Contract Title:
2009-012-00 EXP TURTLE FLATS/WILLAMETTE CONFLUENCE REFORESTATION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This project will restore plant native species to restore diverse habitats on 64 acres disturbed by grading and excavation to restore floodplain channel complexity on the larger 195-acre project site at the confluence of the Coast & Middle Forks of the Willamette River.  The project involves three contiguous properties owned by project partners: Friends of Buford Park & Mt. Pisgah (Friends), The Nature Conservancy (TNC) and Oregon Parks & Recreation Dept (OPRD).  The project will restore: 1) Emergent Wetland (5.36 acres),  2) Forested Wetland (3.57 acres), 3) Riparian Forest (29.78 acres), 4) Scrub-Shrub Wetland (10.65 acres), and 5) Prairie/Savanna (12.56 acres).
Account Type(s):
Expense
Contract Start Date:
09/01/2016
Contract End Date:
02/28/2018
Current Contract Value:
$280,179
Expenditures:
$280,179

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarker
5 m
10 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 6 of 6 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A179506185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$7790.28%01/01/201702/28/2018
B179507119Manage and Administer ProjectsManage and Administer ProjectAdminister BPA contract. Manage staff / labor inputs and coordinate project implementation Track project expenses and prepare fiscal reports. Track matching/cost share funds. Prepare periodic invoices.$1,0000.36%09/01/201602/28/2018
C179508165Produce Environmental Compliance DocumentationProduce Environmental Compliance DocumentsAssist BPA with environmental compliance, as well as obtain all necessary local, state, and federal permits for the project.$1,0000.36%09/01/201608/31/2017
D179509199Remove VegetationRemove VegetationIn September and October, prepare planting areas on 64 acres by controlling invasive vegetation. Methods may include manual, mechanical, thermal and chemical treatment methods. Between April and August (after planting), periodically assess presence of and treat persistent invasive species.$75,40026.91%09/01/201602/28/2018
E17951047Plant VegetationPlant VegetationPlant woody and herbaceous native plants on 61.92 acres to restore five habitat types: Approximately half this work element will be done by a subcontractor. Emergent Wetland (5.36 acres) Scrub-shrub Wetland (10.65 acres) Forested Wetland (3.57 acres) Riparian Forest (39.78 acres) Prairie/Savanna (12.56 acres)$201,50071.92%09/01/201602/28/2018
F179511132Produce Progress (Annual) ReportSubmit Progress Report for the period (Sep 2016) to (Nov 2017)The progress report summarizes the project goal, objectives, hypotheses (for research), completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. Non-technical Progress Reports must conform to BPA guidelines. See the "Non-technical Progress Report" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments.$5000.18%01/01/201802/28/2018
      
$280,179
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Manage and Administer Project 02/28/2018 02/28/2018
Produce environmental compliance documentation C: 165. Produce Environmental Compliance Documents 08/31/2017 11/30/2016
Control Invasive Species D: 199. Remove Vegetation 02/28/2018 01/31/2018
Submit Plant Installation Report E: 47. Plant Vegetation 06/30/2017 06/30/2017
Completed Annual Report F: 132. Submit Progress Report for the period (Sep 2016) to (Nov 2017) 02/28/2018 02/28/2018

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 06/01/2016
B 119 Manage and Administer Project 06/01/2016
C 165 Produce Environmental Compliance Documents 06/01/2016
D 199 Remove Vegetation 11/30/2016
E 47 Plant Vegetation 11/30/2016
F 132 Submit Progress Report for the period (Sep 2016) to (Nov 2017) 09/01/2016