| A | 165 | Produce Environmental Compliance Documentation | Provide environmental compliance information to BPA projects on Forest Service Lands | Nineteenmile barrier replacement project: The Nez Perce - Clearwater National Forests is the lead agency and will complete all necessary environmental compliance for all aspects of this project including NEPA, ESA, and cultural resources requirements.
The Forest Service has completed many of the environmental compliance requirements for the actions proposed in this contract (all applicable NEPA, ESA, and cultural resources consultation) as well as any additional documentation that needs to be completed, will be completed for all contract actions and sent to the BPA Environmental Lead for review and approval. | | |
| B | 184 | Install Fish Passage Structure | Nineteenmile Creek Barrier Replacement | The Nez Perce Tribe (NPT) and the Nez Perce Clearwater National Forest (NPCNFs) will work as partners to implement this project. The project is located on Forest Service Road 223 at milepost 9.0 crossing on Nineteenmile Creek.
The NPT will subcontract with the NPCNFs through our partnership agreement to administer the implementation subcontract.
The Nez Perce Tribe will assist in bid package preparation, subcontractor selection, technical oversight, final inspection, and the associated project implementation. | Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed), Steelhead (O. mykiss) - Snake River DPS (Threatened), Trout, Bull (S. confluentus) (Threatened) | Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened), Cutthroat Trout, Westslope (O. c. lewisi), Lamprey, Pacific (Entosphenus tridentata) |
| C | 199 | Remove Vegetation | Invasive plant treatment | The USFS completed the Selway Bitterroot Weeds Environmental Impact Statement in 2008 and outlines areas in need of invasive species treatment. The focus will include corridors of invasion, such as roads, trails, and disturbed areas.
The Nez Perce Tribe will collaborate with the Nez Perce - Clearwater National Forests (NPCNFs) who will implement the invasive plant treatment. The Nez Perce Tribe will assist in inventory, planning, contractor selection, technical oversight, and the final inspection. | Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed), Steelhead (O. mykiss) - Snake River DPS (Threatened) | Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened), Cutthroat Trout, Westslope (O. c. lewisi), Lamprey, Pacific (Entosphenus tridentata), Trout, Bull (S. confluentus) (Threatened), Trout, Rainbow (Oncorhynchus mykiss) |
| D | 119 | Manage and Administer Projects | Management, Coordination, and Communication | Project management includes coordinating project activities, attending meetings and workshops, seeking additional funding, prioritizing and scheduling projects, employee supervision, preparing statements of work, managing budgets, and completing reports. NPT personnel will participate in US Forest Service Level 1 coordination meetings, other watershed-wide resource planning efforts, and the review and assessment of resource project proposals in the watershed. Training will be competed as needed for key personnel to maintain best management practices.
The Nez Perce Tribe and the Nez Perce - Clearwater National Forests have been partners in watershed restoration since 1996, which includes sharing funds and resources to complete projects. Each year, project specifics are clearly defined in an agreement that is approved by both parties. | | |
| E | 132 | Produce Progress (Annual) Report | Annual Report - April 2016 - March 2017 | Summarize the project goal, objectives, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning for future improvement. Were the project designs implemented as planned? Were the desired results achieved? Include before and after pictures.
Utilize new habitat reporting template. BPA-required format guidance can be found at the following link: https://www.cbfish.org/Help.mvc/GuidanceDocuments | | |
| F | 185 | Produce CBFish Status Report | Quarterly Status Reports | The NPT shall report on the status of milestones and deliverables in Pisces on a quarterly basis. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | | |