A | 97629 | 165 | Produce Environmental Compliance Documentation | Produce EC documents on identified projects | Provide environmental consultation documents to include, but not limited to draft biological assessment, HIP II, cultural surveys and/or permits on PBSC #1 water conservation project and PBSC #9 diversion closure and irrigation project. The EC on the IDFG re-habilitation project and willow planning on IDFG property and lower Pahsimeroi Fence was completed in last year's contract. | $7,000 | 0.55% | 10/18/2010 | 10/29/2011 |
B | 97630 | 175 | Produce Design | Produce Design and/or Specifications | Funds for this work element are intended to cost share with the NRCS for a staff position in Challis that will direct focus on BPA funded projects for the design, cultural surveys, construction specifications, construction certification and overall assistance with these projects. This will address projects currently in this FY project and those being developed for future FY contracts. | $21,600 | 1.69% | 10/01/2010 | 04/20/2012 |
C | 97631 | 150 | Install Sprinkler | Install irrigation system to provide water conservation on PBSC 1 | Install Sprinklers on property being irrigated from Patterson/Big Springs Creek #1 to provide opportunity for a water agreement providing 5 cfs to go past the last point of diversion on PBSC and into the Pahsimeroi. | $414,000 | 32.44% | 10/18/2010 | 04/27/2012 |
D | 97632 | 150 | Install Sprinkler | Install Sprinkler to allow closure of the PBSC #9 Ditch and Diversion | Install Sprinklers on property being irrigated from Patterson/Big Springs Creek #9 to provide opportunity to close the PBSC #9 Ditch and Diversion. | $200,773 | 15.73% | 10/16/2010 | 04/27/2012 |
E | 97633 | 40 | Install Fence | Install fence on lower Pahsimeroi | Materials for approximately 8000 feet of fence along property in the lower portion of the Pahsimeroi will have been purchased from contract #44134. Additional footage is necessary to complete this project and sea up the lower portion of the Pahsimeroi. Project funding from BPA will cost share on the materials for the fence. Landowner will cover costs to construct the fence. Some costs associated with preparation of the fence line may require some level of cost share. | $5,880 | 0.46% | 06/01/2011 | 09/15/2011 |
F | 97634 | 22 | Maintain Vegetation | Maintain and Continue plantings on IDFG Easement Property | Ground prep and plantings will have been completed under contract #44134. This work element will determine success and either re-plant or maintain work completed in the previous contract. | $2,200 | 0.17% | 10/18/2010 | 08/31/2011 |
G | 97635 | 119 | Manage and Administer Projects | Manage and administer projects within this contract | Provide project management to improve water delivery and enhance flows from Patterson Big Springs Creek and the Pahsimeroi. This included but is not limited to project identification and prioritization, project management, oversight of environmental compliance, coordination with IDWR, guidance of bid process and tasks associated with project management. A project list has been identified within the working group that includes IDFG Screen Shop, TNC, NRCS and BOR. This list is provided as an attachment in this SOW. Projects in development and waiting written approval from DFG Screen Shop, BPA and OSC include but are not limited to the closure of Patterson/Big Springs Creek 9, Water Conservation Project on PBSC #1 and diversion closure of P-13 and diversion improvements above Furey Lane. | $24,579 | 1.93% | 10/18/2010 | 04/30/2012 |
H | 97636 | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period Oct 10 thru Sept 11 | The progress report summarizes the project goal, objectives, hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or level of effort for contract implementation, including any ramping up or ramping down of contract components or of the project as a whole. Date range Oct 09 thru Sept 11 will be agreed upon by the COTR and the contractor. This may or may not coincide with the contract period. For an ongoing project, a progress report covering a contract period may be submitted under the subsequent contract, if approved by the COTR.
Progress reports must conform to BPA guidelines. See the ''formatting guidelines'' link at the Technical Reports and Publications page: https://www.cbfish.org/Help.mvc/GuidanceDocuments.
If producing a technical report for this contract, a discrete experiment, or a peer-reviewed publication, use work element 183: Produce Journal Article. | $1,000 | 0.08% | 06/01/2011 | 04/13/2012 |
I | 97637 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $1,500 | 0.12% | 01/01/2011 | 04/30/2012 |
J | 97638 | 184 | Install Fish Passage Structure | Remove culverts/passage barriers on Patterson/Big Springs Creek on Hooper Lane | Hooper Lane cuts across the Pahsimeroi Valley approximately 13 miles upstream from the mouth of the Pahsimeroi River. There are 4 culvert crossings on the road that are currently undersized, and can restrict fish passage at certain flows. These culverts carry Big Springs Creek, Big Springs, Connector Channel, Little Springs Creek, and Pahsimeroi River flows. Replacing these culverts will improve passage to the upstream ends of these drainages for juvenile Chinook salmon, steelhead, and other native species.
Replacement of the 4 culverts with bridges, originally suggested by Idaho Fish and Game biologists, was ranked by the Upper Salmon Basin Watershed Program Tech Team in December of 2010. The project scored 76, which is a "high" ranking. US Bureau of Reclamation has completed designs for the bridges. The project is being coordinated through the Custer Soil and Water Conservation District (CSWCD), the Custer County Road Department, and the Lemhi County Road Department. Reclamation will provide construction oversight, and CSWCD will act as the contract officer. Construction is planned for July/August of 2011. | $155,710 | 12.20% | 04/08/2011 | 09/30/2011 |
K | 97639 | 184 | Install Fish Passage Structure | Remove culverts/passage barriers on Patterson/Big Springs Creek Connector Channel on Hooper Lane | Hooper Lane cuts across the Pahsimeroi Valley approximately 13 miles upstream from the mouth of the Pahsimeroi River. There are 4 culvert crossings on the road that are currently undersized, and can restrict fish passage at certain flows. These culverts carry Big Springs Creek, Big Springs connection ditch, Little Springs Creek, and Pahsimeroi River flows. Replacing these culverts will improve passage to the upstream ends of these drainages for juvenile Chinook salmon, steelhead, and other native species.
Replacement of the 4 culverts with bridges, originally suggested by Idaho Fish and Game biologists, was ranked by the Upper Salmon Basin Watershed Program Tech Team in December of 2010. The project scored 76, which is a "high" ranking. US Bureau of Reclamation has completed designs for the bridges. The project is being coordinated through the Custer Soil and Water Conservation District (CSWCD), the Custer County Road Department, and the Lemhi County Road Department. Reclamation will provide construction oversight, and CSWCD will act as the contract officer. Construction is planned for July/August of 2011. | $129,300 | 10.13% | 04/08/2011 | 09/30/2011 |
L | 97640 | 184 | Install Fish Passage Structure | Remove culverts/passage barriers on Patterson Little Spring Creek on Hooper Lane | Hooper Lane cuts across the Pahsimeroi Valley approximately 13 miles upstream from the mouth of the Pahsimeroi River. There are 4 culvert crossings on the road that are currently undersized, and can restrict fish passage at certain flows. These culverts carry Big Springs Creek, Big Springs connection ditch, Little Springs Creek, and Pahsimeroi River flows. Replacing these culverts will improve passage to the upstream ends of these drainages for juvenile Chinook salmon, steelhead, and other native species.
Replacement of the 4 culverts with bridges, originally suggested by Idaho Fish and Game biologists, was ranked by the Upper Salmon Basin Watershed Program Tech Team in December of 2010. The project scored 76, which is a "high" ranking. US Bureau of Reclamation has completed designs for the bridges. The project is being coordinated through the Custer Soil and Water Conservation District (CSWCD), the Custer County Road Department, and the Lemhi County Road Department. Reclamation will provide construction oversight, and CSWCD will act as the contract officer. Construction is planned for July/August of 2011. | $130,205 | 10.20% | 04/08/2011 | 09/30/2011 |
M | 97641 | 184 | Install Fish Passage Structure | Remove culverts/passage barriers on Pahsimeroi on Hooper Lane | Hooper Lane cuts across the Pahsimeroi Valley approximately 13 miles upstream from the mouth of the Pahsimeroi River. There are 4 culvert crossings on the road that are currently undersized, and can restrict fish passage at certain flows. These culverts carry Big Springs Creek, Big Springs connection ditch, Little Springs Creek, and Pahsimeroi River flows. Replacing these culverts will improve passage to the upstream ends of these drainages for juvenile Chinook salmon, steelhead, and other native species.
Replacement of the 4 culverts with bridges, originally suggested by Idaho Fish and Game biologists, was ranked by the Upper Salmon Basin Watershed Program Tech Team in December of 2010. The project scored 76, which is a "high" ranking. US Bureau of Reclamation has completed designs for the bridges. The project is being coordinated through the Custer Soil and Water Conservation District (CSWCD), the Custer County Road Department, and the Lemhi County Road Department. Reclamation will provide construction oversight, and CSWCD will act as the contract officer. Construction is planned for July/August of 2011. | $161,710 | 12.67% | 04/08/2011 | 09/30/2011 |
N | 97642 | 85 | Remove/Breach Fish Passage Barrier | Remove two culverts on Muddy Springs and replace with bottomless culverts | Remove two culverts along the Lower Muddy Springs to improve fish passage in that reach of the stream. | $15,840 | 1.24% | 05/01/2011 | 09/30/2011 |
O | 97643 | 99 | Outreach and Education | Coordinate with Agencies and Contractors to complete a training for In-Stream Work Windows | CH2M HILL will conduct a one-day workshop for IDFG, other agency staff and contractors in Salmon, Idaho. The goal of the workshop is to discuss issues relating to in water construction of culvert installations/replacements (I/Rs), headgate I/R’s, bridge I/R’s, road construction, as well as restoration and habitat improvement projects in the State of Idaho. Topics will include best management practices for sediment control, channel diversion, rip rap, permitting, erosion control methods, water control during construction, and re-establishment of vegetation. CH2M HILL will present recent lessons learned on projects similar to those conducted by IDFG. As part of the workshop, CH2M HILL will provide attendees with a binder summarizing the workshop topics, and a laminated Best Management Practice (BMP) “quick reference” card for construction personnel to carry on project sites. | $4,800 | 0.38% | 04/15/2011 | 05/06/2011 |