Work Element 150: Install Sprinkler - Published
WE Name:
150. Install Sprinkler (Install Sprinkler)
Work Category:
Habitat - Water Conservation and Irrigation Practices
WE Agreement Type:
Contracted
Status:
Expired
Definition:
Includes activities related to installing a sprinkler system. This work element is only for work designed to provide irrigation efficiencies which result in increased instream flow. Thus, other options should have already been considered to accomplish this purpose, such as water transactions or obtaining cost-share for this work element and subsequently transferring conserved water instream. To cover initial work to put conserved water instream, including coordinating with the Columbia Basin Water Transactions Program, also use 154. Develop and Negotiate Water Right Transaction and 164. Acquire Water Instream.
WSE Description Template:
Effective Dates:
FY2005 to FY2014
Note on Expiration:
Work Phase:
construction/implementation
Sort Sequence:
14.04
Focal Species Required:
Yes
RM&E Metadata Required:
No
Finite or Recurring:
Finite
Is BPA Internal:
No
Is Contracted:
Yes
Is Cost Share:
No
Is Construction:
No


Deliverable Status:
Required
Default Deliverable Desc:
Sprinkler
Potential Deliverables:
  • Installed, operational sprinkler system

  • Rule 1 (Environmental Compliance): NEPA, ESA, and other permitting and environmental compliance work should be split out under 165. Produce Environmental Compliance Documentation.

    Example:

    WE: 150. Install Sprinkler (Expired)
    WE Title: Install sprinkler system for Anglemann Farms.

    WE: 165. Produce Environmental Compliance Documentation
    WE Title: Prepare local permits and ESA compliance for the Anglemann Farms sprinkler system.

  • Rule 2 (Location of Work): If the project involves installing multiple sprinklers at different sites, split out each site as a separate work element because the metrics will be different for each.

    Example:

    WE: 150. Install Sprinkler (Expired)
    WE Title: Install sprinkler system for Angelman Farms.

    WE: 150. Install Sprinkler (Expired)
    WE Title: Install sprinkler system for Cascade Ranch.

  • Rule 3 (Metrics): If the sprinkler system is being installed as part of a connected effort to deal with multiple factors at a single location, each with different metrics, split out each as a separate work element. For example: Cow Creek is being restored as part of a basin-wide effort to open up tributary habitat. Historically, fish passage on Cow Creek was impeded in several places by push up dams. The proposal involves taking out a push up dam, restoring channel conditions, developing a well as an alternative irrigation water source, and putting in a pipeline and sprinkler system to convey the well water to the farm. Use the following work elements:

    Example:

    WE: 150. Install Sprinkler (Expired)
    WE Title: Install sprinkler system at Johnson Farms
    WE Description: Pipeline, pump, and sprinkler system will replace old push up dam and ditch.

    WE: 84. Remove/Install Diversion (Expired)
    WE Title: Remove push up diversion on Cow Creek, RM 14, and replace with pump
    WE Description: Remove push up dam previously used to provide water for Johnson Farms and replace with a pump for pressurized sprinkler system.

    WE: 29. Increase Aquatic and/or Floodplain Complexity
    WE Title: Add J-hooks and large woody debris at old Johnson dam site.
    WE Description: J-hooks and LWD will improve channel morphology and stabilize the streambank.

    WE: 149. Install Pipeline (Expired)
    WE Title: Install pipeline from new pump on Cow Creek to the 'North 40' sprinkler system.
    WE Description: Pipeline, pump, and sprinkler system will replace old push up dam and ditch.


Milestone Title
Type
Deliverable?
Description

Environmental compliance requirements complete -New
Required
No
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
Hold initial kick-off meeting with all stakeholders
Suggested
No
Mobilize crew
Suggested
No
Supplies/materials/equipment delivered
Suggested
No
Attach a completed water survey form in CBFish
Required
No
The water survey form is located at: https://www.cbfish.org/EfwDocument.mvc/DownloadFile/17. The form should be completed prior to construction by the contract manager or BPA project manager and attached in CBFish.
Estimate amount of conserved water to be put instream
Suggested
No
Prepare an estimate of conserved water that will go instream through the state conserved water program. Contact Columbia Basin Water Transactions Program (www.cbwtp.org) for technical assistance.
If conserved water will be put instream, submit draft water transaction checklist to
Suggested
No
Contact the Columbia Basin Water Transactions Program to work with a CBWTP local entity to submit a draft water transaction checklist (template located in section 2 at (http://www.cbwtp.org/jsp/cbwtp/program/apply.jsp) for the conserved water.
Coordinate with the CBWTP to have conserved water secured
Suggested
No
The CBWTP qualified local entity (QLE) may provide assistance to ensure conserved water is transferred instream through the applicable state agency.


4 Metrics Associated With Work Element 150: Install Sprinkler

Metric Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Is Activated By Default Included in PI Supports PCSRF/PNSHP (Katz) PNSHP Metric Code PNSHP Metric
1438: # of miles of primary stream reach improvement Active number 2005 Required Yes Yes Yes C.3.b Length of stream 'protected' for adequate flow
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Miles of stream enhanced with flow
1439: # of miles of total stream reach improvement Active number 2005 Required Yes Yes Yes C.3.b Length of stream 'protected' for adequate flow
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Miles of stream enhanced with flow
1440: Amount of unprotected water flow returned to the stream by conservation in acre-feet/year Active number 2005 Required Yes No Yes C.3.e.2 Acre feet of water conserved per year
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Amount of water acquired/protected
1451: Amount of unprotected water flow returned to the stream by conservation in cubic-feet per second (cfs) Active number 2005 Required Yes No Yes C.3.e.3 cfs (cubic feet per second) of water conserved
ITS Action Category:
Flow Enhancement/Protection
ITS Metric:
Amount of water acquired/protected

Supports PCSRF/PNSHP (Katz):

Yes

PNSHP Metric Association Metric
C.0 Salmonid Habitat Restoration and Acquisition
    C.3 Instream Flow Project
        C.3.b Length of stream 'protected' for adequate flow
1438: # of miles of primary stream reach improvement
1439: # of miles of total stream reach improvement
C.0 Salmonid Habitat Restoration and Acquisition
    C.3 Instream Flow Project
        C.3.e.1 Irrigation practice improvement
            C.3.e.2 Acre feet of water conserved per year
1440: Amount of unprotected water flow returned to the stream by conservation in acre-feet/year
C.0 Salmonid Habitat Restoration and Acquisition
    C.3 Instream Flow Project
        C.3.e.1 Irrigation practice improvement
            C.3.e.3 cfs (cubic feet per second) of water conserved
1451: Amount of unprotected water flow returned to the stream by conservation in cubic-feet per second (cfs)

Location Requirement Type:
Location Work Site in CBFish
Number of Locations:
1
Location Guidance:
Identify point where sprinkler is located. If a location already exists in Pisces, click the "Link" button to synchronize locations.

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in CBFish in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in CBFish, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically required for this work element which often includes a cultural/historic resource survey by a qualified archaeologist.

  • Public Involvement
    Public involvement is typically not required for this work element.


Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #150 by FY

Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Jan Brady (Inactive) 11
Joe Deherrera (Inactive) 10
Jay Marcotte (Inactive) 6
Jamie Cleveland (Inactive) 4
Cecilia Brown (Inactive) 3
Average Work Element Budget: $107,612
Average Duration: 11 months