SOW Report
Contract 59694: 2007-403-00 EXP ID SPR CHINOOK CAPTIVE PROP
Project Number:
Title:
Spring Chinook Captive Propagation-Idaho
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
59694
Contract Title:
2007-403-00 EXP ID SPR CHINOOK CAPTIVE PROP
Contract Continuation:
Previous: Next:
54251: 2007-403-00 EXP ID SPR CHINOOK CAPTIVE PROPAGATION
  • 62939: 2007-403-00 EXP ID SPR CHINOOK CAPTIVE PROP
Contract Status:
Closed
Contract Description:
The ultimate goal of the Idaho Department of Fish and Game (IDFG) Captive Rearing Program of Salmon River Spring Chinook Salmon is to maintain a minimum number of adults spawning in specific target streams annually.  To achieve this goal, the program is testing the efficacy of the captive rearing conservation approach.  Project activities are divided into two parts:  1) hatchery propagation and 2) spawning performance monitoring and evaluation.  The success of the project depends on developing culture techniques to produce fish with proper behavioral, morphological, physiological characteristics to successfully interact with and breed with wild individuals.  Field monitoring is used to document behavioral interactions, spawn timing, success of redds spawned by captive-reared individuals, and to determine if changes in culture technique result in desired changes in reproductive behavior or performance.&nb... sp; In addition, an important component of this program is to document successful production (juveniles and adults) from captive adult spawning events.

1) Hatchery Propagation:
a) Early Rearing (eyed-egg through smolt).  Approximately 300 eyed-eggs collected from wild/natural redds on the East Fork Salmon River and the West Fork Yankee Fork.  Eyed-eggs are collected from five to six wild/natural redds and the eggs are transported to Eagle Fish Hatchery for incubation and rearing.  Eagle Fish Hatchery will culture these Chinook salmon through the smolt stage at which time they are transported to NOAA Fisheries Manchester Research Station for seawater rearing through maturation.  While in culture at Eagle Fish Hatchery; water temperature and growth rates are monitored closely to produce smolts similar in size as to their natural counterparts.  During early rearing (first 15 months), juveniles are maintained in family groups based on the redd the eyed-eggs are collected from, at this point juveniles are PIT tagged and groups are mixed, while maintaining segregation between stocks.  Before transfer to seawater, the juveniles are vaccinated with Renogen and Vibrogen, and marked with an Elastomer tag.

b) Adult Holding:  Maturing adult Chinook salmon are transported back to Eagle Fish Hatchery for temporary holding in freshwater before release to natal streams (July/August).

2) Spawning Performance Monitoring and Evaluation:
a) Eyed-egg collections.  Idaho Department of Fish and Game (IDFG) research biologists monitor wild/natural Chinook salmon spawning activities, documenting redd development (location) and stream temperatures.  Based on this information, naturally spawned eyed-eggs are collected from approximately 15 redds in each drainage by hydraulically sampling (redd pumping) individual redds.   All eyed eggs collected are used as research subjects for the emergence survival study and ongoing parent-progeny genetic analyses.  Eggs are no longer collected for captive culture broodstock.  Upon sampling, dead eggs, egg-shells, and live eggs are enumerated to estimate survival to the eyed-egg stage of development.  Next, Approximately 80 eyed-eggs are collected per redd.  Collected eggs are used in two ways. First, approximately 40 eyed-eggs are carefully placed into an egg capsule filled with gravel collected from the redd (treatment group) and inserted back into the natal redd from where it came . Second, another 40 eggs are taken to the Eagle FH for incubation and rearing (see #1 above).

Surviving fry from both control (hatchery) and treatment (egg capsule) study groups are sampled after depletion of yolk reserves, determined by tracking accumulated Celsius temperature units (CTU’s) and using historic emergence timing estimates for similar stocks of Chinook salmon. After enumeration and survival estimation, fry hatched from BY08 egg collections from both treatment (egg capsule) and control (hatchery incubation) groups will be lethally sampled, after yolk-absorption in early-2009, and fin clips taken for later genetic analyses.

b) Adult Observations:  After maturing Captive Reared Chinook salmon adults are transported back to Eagle Fish Hatchery, adults are marked for visual identification in the field after release.  Petersen Disc, jaw, spaghetti, or floy tags are used to mark individual fish.  A blocking weir is installed on the East Fork Salmon River to contain the captive reared salmon in the observation area (wild/natural salmon and other species are allowed to move up or down stream freely.  Radio transmitters are also inserted in six to eight adults to assist with tracking adult movements within the West Fork Yankee Fork after release, since no blocking weir is installed.  Spawning observations include: habitat selection (pool, rifle/run, cut bank, overhead vegetation) and behavioral observations (holding, aggression, courting, moving, milling). spawn timing, and spawning behavior.

c) Reproductive Success:  Genetic samples are collected from all released captive reared adult salmon and from about 500 juveniles.  This information is used to determine if spawning events from captive reared Chinook salmon produced offspring the following summer using parental exclusion genetic analyses.
  
Account Type(s):
Expense
Contract Start Date:
10/01/2012
Contract End Date:
09/30/2013
Current Contract Value:
$284,477
Expenditures:
$284,477

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarkerMarker
1 km
3000 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 10 of 10 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A105268165Produce Environmental Compliance DocumentationChinook salmon captive rearing compliance report and permitsProduce, submit and maintain required Environmental Compliance documentation satisfying National Environmental Policy Act (NEPA) requirements.$10,0004.37%10/01/201209/30/2013
B10526970Install Fish Monitoring EquipmentOperate and maintain adult trap on East Fork Salmon RiverAn adult trap is maintained and operated on the East Fork of the Salmon River (EFSR) to monitor anadromous Chinook salmon migration. Environmental compliance permits will have approval before implementation.$29,00012.67%10/01/201209/30/2013
C105270158Mark/Tag AnimalsMarking and tagging Chinook salmon for evaluation of programVisually mark returning anadromous Chinook salmon for monitoring and evaluation activities. Follow guidelines outlined in Permit 1010 when handling anadromous Chinook salmon.$8,0003.50%10/01/201209/15/2013
D105271157Collect/Generate/Validate Field and Lab DataChinook salmon captive rearing field evaluationsMonitor anadromous Chinook salmon returns and redd development on the East Fork Salmon River. Collect genetic samples of juvenile and adult Chinook salmon to evaluate reproductive success of captive-reared adults. Data summaries/conclusions will be presented at the Chinook Salmon Captive Propagation Technical Oversight Committee (CSCPTOC) meetings and used to make program specific recommendations.$45,00019.67%10/01/201209/30/2013
E112626191Watershed CoordinationQuarterly Chinook Salmon Captive Propagation (CSCPTOC) coordination meetingChinook Salmon Captive Propagation Technical Oversight Committee (CSCPTOC) meetings are held at least four times per year. Participants provide written material (exhibits) that are discussed during the TOC meetings. Minutes are kept of the meeting. The minutes plus the exhibits are the deliverable document program status and are a basis for planning and coordination of program activities.$2,0000.87%10/01/201209/30/2013
F105272162Analyze/Interpret DataAnalyze and interpret data for the Chinook salmon captive rearing programAnalyzed data will be included in Chinook Salmon Captive Propagation Technical Oversight Committee (CSCPTOC) updates and presented in bi-monthly meetings. Analyzed data is used to make project/program management decisions and included in Progress (Annual) reports (See WE: 165 and 132). Genetic samples will be analyzed to evaluate captive reared Chinook salmon adult production and contribution to adult returns.$100,00043.71%10/01/201209/30/2013
G105277174Produce PlanChinook Salmon Captive Rearing Annual Operating Plan (AOP)Develop an annual operating plan for the Chinook Captive Rearing program at Eagle Fish Hatchery. Plan will be a combined report covering Hatchery production goals and maintenance goals. Submit a Salmon River AOP.$1,0000.44%10/01/201209/30/2013
H105275132Produce Progress (Annual) ReportChinook salmon captive rearing BPA Progress (Annual) report (1/1/12 - 12/31/12)Produce a Progress (Annual) report for BPA covering research activities at from 1/1/2012 through 12/31/2012. *NOTE 2013 is a Pilot Year for the new Annual Progress Report and RPA BiOp Report (Optional). Both of these reports are due to BPA by March 1, 2013 and will cover work from the previous calendar year (January 1 - December 31) The sponsor may choose to either be part of this Pilot Year project or may continue to submit their Annual Progress Report per their original end date detailed in their milestones under this work element. 2014 will be the first year where it will be a requirement that Annual Progress Reports and RPA BiOp Reports (if a project has RPA's that support the BiOp) will be finalized and submitted to BPA by March 1 which will cover project work from the previous calendar year (January 1 - December 31).$18,0007.87%10/01/201209/30/2013
I105273119Manage and Administer ProjectsManage and Administer projects associated with the Chinook Salmon Captive Rearing ProgramManage on the ground execution of contract including administration work in support of on the ground efforts to support BPA's programmatic requirements such as metric reporting, financial reporting and development of SOW package. Attend training and professional conferences following guidelines outlined in BPA Contracting Manual.$15,0006.56%10/01/201209/30/2013
J105267185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$8000.35%01/01/201309/30/2013
      
$228,800
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA compliance documentation completed and submitted A: 165. Chinook salmon captive rearing compliance report and permits 03/29/2013 03/29/2013
Adult trap facility operational and ready to capture natural adult Chinook salmon. B: 70. Operate and maintain adult trap on East Fork Salmon River 09/30/2013 06/13/2013
Marking/Tagging activities associated with Chinook salmon Captive Rearing M & E C: 158. Marking and tagging Chinook salmon for evaluation of program 09/15/2013 09/15/2013
Collection of field data associated with the Chinook Captive Rearing M and E D: 157. Chinook salmon captive rearing field evaluations 09/30/2013 09/20/2013
Quarterly Chinook Salmon Captive Propagation ( E: 191. Quarterly Chinook Salmon Captive Propagation (CSCPTOC) coordination meeting 09/30/2013 09/27/2013
Analyze and Interpret Chinook Salmon data from the EFSR. F: 162. Analyze and interpret data for the Chinook salmon captive rearing program 09/30/2013 09/27/2013
Final Salmon River and Eagle Hatchery Annual Operating Plan (AOP) uploaded to Pisces contract. G: 174. Chinook Salmon Captive Rearing Annual Operating Plan (AOP) 09/30/2013 09/30/2013
Chinook Salmon Captive Rearing Progress (Annual) Report: activities from 1/1/12 through 12/31/12. H: 132. Chinook salmon captive rearing BPA Progress (Annual) report (1/1/12 - 12/31/12) 09/30/2013
Manage and Administer BPA project I: 119. Manage and Administer projects associated with the Chinook Salmon Captive Rearing Program 09/30/2013 09/27/2013

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Chinook salmon captive rearing compliance report and permits 10/01/2012
B 70 Operate and maintain adult trap on East Fork Salmon River 07/16/2013
C 158 Marking and tagging Chinook salmon for evaluation of program 07/16/2013
D 157 Chinook salmon captive rearing field evaluations 07/16/2013
E 191 Quarterly Chinook Salmon Captive Propagation (CSCPTOC) coordination meeting 10/01/2012
F 162 Analyze and interpret data for the Chinook salmon captive rearing program 10/01/2012
G 174 Chinook Salmon Captive Rearing Annual Operating Plan (AOP) 10/01/2012
H 132 Chinook salmon captive rearing BPA Progress (Annual) report (1/1/12 - 12/31/12) 10/01/2012
I 119 Manage and Administer projects associated with the Chinook Salmon Captive Rearing Program 10/01/2012
J 185 Periodic Status Reports for BPA 10/01/2012