Province | Subbasin | % |
---|---|---|
Basinwide | - | 100.00% |
Previous: | Next: |
---|---|
76910 REL 21: 1991-051-00 EXP STATISTICAL SUPPORT LIFE CYCLE STUDIES |
|
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Rebecca Buchanan | University of Washington | Yes | Supervisor | rabuchan@uw.edu | (206) 685-2793 |
Lisa Cantore | University of Washington | No | Interested Party | lcantore@uw.edu | (206) 616-9521 |
Jay Chong | Bonneville Power Administration | Yes | Contracting Officer | jxchong@bpa.gov | (503) 230-4007 |
Kristen Jule | Bonneville Power Administration | Yes | F&W Approver | krjule@bpa.gov | (503) 230-3588 |
Christine Petersen | Bonneville Power Administration | Yes | COR | chpetersen@bpa.gov | (503) 230-4695 |
Jenna Peterson | Bonneville Power Administration | Yes | Interested Party | jepeterson@bpa.gov | (503) 230-3018 |
Jessica Power | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
Craig Scanlan | University of Washington | Yes | Contract Manager | cpscan@uw.edu | (206) 685-1995 |
Richard Townsend | University of Washington | Yes | Technical Contact | rich@u.washington.edu | (206) 616-7492 |
A | 246928 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $4,854 | 1.15% | 04/01/2023 | 12/31/2023 |
B | 246929 | 162 | Analyze/Interpret Data | Provide RealTime predictions | This task estimates in real time the “percent of run to date” and the “date to specified percentiles” during the spring and summer smolt outmigration periods for 66 salmonid stocks, ESUs, and composite groups. Results are posted daily on the DART website, http://www.cbr.washington.edu/inseason. The task ends with an end-of-year evaluation of the accuracy of the run-timing predictions. | $78,076 | 18.45% | 01/01/2023 | 12/31/2023 |
C | 246930 | 162 | Analyze/Interpret Data | Analyze and integrate performance measures | The BiOp, Remand, and RM&E working groups have identified a myriad of performance measures to be evaluated during check-ins and recovery assessments. This task will continue in the development and update of an integrated performance database to allow fish managers, independent investigators, the BPA, and the public to evaluate for themselves the status and trends of performance measures leading to recovery decisions. This will include updating ROSTER analyses as needed. New databases will be added as directed by BPA needs. The interactive software on the internet will allow users to review information sorted by stock, location, province, subbasin, performance measures, or any combination thereof. The site also assists users in summarizing the information based on their own unique priorities for recovery. Websites will be developed to report adult fallback and migration delay at dams. A focus in 2023 will be to continue assisting the BPA and their agencies with the proper approach to the analysis of monitoring data. Assistance to the BPA may consist of technical reviews and one-of-a-kind data analysis to assist in decision and management, assistance in the design and interpretation of the spring spill experiment and Ice Harbor turbine survival study, and in responding to proposed changes in the PIT plan. We will continue our efforts to assist agencies with proper approaches to analyzing juvenile outmigration in the tributaries, fallback, and adult escapement. | $124,142 | 29.34% | 01/01/2023 | 12/31/2023 |
D | 246931 | 122 | Provide Technical Review and Recommendation | Provide independent analytical capabilities | To help fulfill the BPA's annual reporting and management responsibilities for power production and resource protection, this task provides the BPA with analytical capabilities to peer review reports, independently analyze data, and respond to quantitative technical issues. These statistical services are provided to BPA on an "as needed" basis as resource issues arise requiring analysis. This effort also provides the BPA with the ability to peer review study plans and technical reports. | $189,869 | 44.87% | 01/01/2023 | 12/31/2023 |
E | 246932 | 119 | Manage and Administer Projects | Project management | Management of personnel, financial reporting, budget planning, property inventory, and development of SOW. | $20,647 | 4.88% | 01/01/2023 | 12/31/2023 |
F | 246933 | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period (Jan 2023) to (Dec 2023) | An annual report will be produced to describe project accomplishments during the previous year in a non-technical manner. Description of software created and statistical analyses performed will be provided. The annual report will include a summary of technology transfer efforts and outreach to the fisheries community through statistical consulting. RM&E Technical Progress reports should generally conform to BPA guidelines. See the "RME Technical Reporting" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments. | $5,573 | 1.32% | 01/01/2023 | 03/15/2023 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Deliverable: An accessible, error-checked data set with metadata | B: 162. Provide RealTime predictions | 12/31/2023 | 12/29/2023 | |
Deliverable: An accessible, error-checked data set with metadata | C: 162. Analyze and integrate performance measures | 12/31/2023 | 12/29/2023 | |
Provide statistical consulting and technical review of M&E plans and reports. | D: 122. Provide independent analytical capabilities | 12/31/2023 | 12/29/2023 | |
Effective implementation management and timely contract administration | E: 119. Project management | 12/31/2023 | 12/29/2023 | |
Completed Annual Report | F: 132. Submit Progress Report for the period (Jan 2023) to (Dec 2023) | 03/15/2023 | 03/14/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Coho (O. kisutch) - Unspecified Population |
|
Sockeye (Oncorhynchus nerka) - All Populations |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 162 | Provide RealTime predictions | |||||||
C | 162 | Analyze and integrate performance measures | |||||||
D | 122 | Provide independent analytical capabilities | |||||||
E | 119 | Project management | |||||||
F | 132 | Submit Progress Report for the period (Jan 2023) to (Dec 2023) |