A | 20030 | 165 | Produce Environmental Compliance Documentation | Scientific Research Compliance Documentation | NEPA/ESA Clearance is required to perform this investigation. Regular coordination and involvement with BPA personnel will be conducted to ensure NEPA clearance. | $15,897 | 2.00% | 02/01/2007 | 01/31/2008 |
B | 20031 | 119 | Manage and Administer Projects | Project Management | Manage and administer project to fulfill BPA requirements of accrual reporting. Prepare statement of work and budget for work to be accomplished in the following fiscal year. Attend BPA training to be able to manage and administer the project as required by BPA.
ODFW employees are required to be trained in specific areas, such as First Aid and CPR, to promote safety and efficiency in the workplace. Required training of employees will be in keeping with mandates of the Oregon Benchmarks for workforce development and to maintain professional growth and continual learning of the workforce (ODFW HR Policy 450.19). Training related costs will be included as a line item in budget. | $7,948 | 1.00% | 02/01/2007 | 01/31/2008 |
C | 20032 | 70 | Install Fish Monitoring Equipment | Screw Trap Installation and Upkeep | This work element is a necessary activity for continued monitoring of the spring Chinook salmon and steelhead populations under this investigation. Removal and installation of rotary screw traps occur occasionally and are generally associated with periods of extreme environmental conditions or periods of unsafe conditions for the species being collected. Rotary screw traps will be operated whenever conditions are favorable, and maintenance of sites and equipment will be performed as needed. | $39,741 | 5.00% | 02/01/2007 | 01/31/2008 |
D | 20033 | 157 | Collect/Generate/Validate Field and Lab Data | Sampling and Data Collection Activities | Milestones described in this work element provide the data needed to understand important life functions associated with early life history of spring Chinook salmon and summer steelhead of Grande Ronde River and Imnaha River basins. In this investigation we operate rotary screw traps to quantify and characterize migratory patterns and survival of migrants of both species. Aspects of natural rearing during summer and winter seasons will be used to describe and monitor abundance, survival, and relative success during these important periods. Measures of stream health provide a means for assessing the condition of aquatic habitats and how they relate to fish survival in the subbasin.
In this performance period we will collect spring Chinook salmon and summer steelhead data that represent multiple migration years. Specifically, fish collected in spring 2007 will primarily migrate to the ocean in spring 2007, whereas most fish collected in the summer, fall and winter of 2007 will primarily migrate to the ocean in spring of 2008. Therefore, fish collected in summer, fall and winter under the FY 2006 performance period will be analyzed along with the fish collected in spring under this performance period, and likewise fish collected under this performance period will be analyzed along with the fish collected under the FY 2008 performance period. Given the diversity of summer steelhead early life history strategies, data for individual migration years may include small proportions of fish collected during as many as three past and or future performance periods, and potentially could be more.
Data collected under this work element will be analyzed under Work Elements G (abundance estimates, age of steelhead from scales, migration timing), H (survival estimates from tagging to Lower Granite Dam), and I (survival in relation to stream health).
This work element will require travel (camping) and transportation (chartered aircraft and horse packing) for field crew and activities.
ODFW negotiated a 10-year access agreement with two landowners on the Lostine River to allow ODFW to operate and maintain a rotary screw trap on the Lostine River. The agreement was signed in March 2004 and an annual payment is due to the landowners in September of each year, unless the agreement is terminated by the landowner or ODFW. | $158,966 | 20.00% | 02/01/2007 | 01/31/2008 |
E | 20034 | 158 | Mark/Tag Animals | PIT Tagging and Marking Juvenile Spring Chinook Salmon and Summer Steelhead | PIT tagging and marking are integral parts of this investigation, and are required to fulfill work elements: Collect/Generate/Validate Field and Lab Data (157); Submit/Acquire Data (159); Analyze/interpret data (162); Produce Annual Report (132). PIT tags are used to monitor abundance, survival and relative success of both spring Chinook salmon and summer steelhead. In addition to our investigation, tagging and marking of these fish provides valuable information for research and management through all life stages. We will require 15,300 PIT tags to fulfill the five milestones described in this work element.
In this Statement of Work (SOW) we will tag spring Chinook salmon and summer steelhead that will migrate to the ocean or be detected across multiple migration years. For example, migrants tagged in spring 2007 will migrate to the ocean in spring 2007, whereas the migrants tagged in the fall of 2007 will not migrate to the ocean until spring of 2008. Therefore, fish tagged in fall under the FY 2006 SOW will be analyzed along with the fish tagged in spring under this SOW, and likewise fish tagged under this SOW will be analyzed along with the fish tagged under the FY 2008 SOW. Given the diversity of summer steelhead emigration tactics, tagged fish may include small proportions of fish tagged during as many as three past and/or future SOW's. | $166,914 | 21.00% | 02/01/2007 | 01/31/2008 |
F | 20035 | 159 | Transfer/Consolidate Regionally Standardized Data | Submittal of Project Data | Data generated by this investigation has been utilized by many different management agencies and interest groups, and is an integral part of fisheries management in the subbasin. All data associated with spring Chinook salmon and summer steelhead PIT tagged during project activities have been uploaded to the Columbia River Basin PIT Tag Information System (PTAGIS) database. In addition, data generated during this investigation have been combined with other programs to identify, evaluate and monitor recovery efforts, and effectively manage fish in the Grande Ronde River Subbasin. | $39,741 | 5.00% | 02/01/2007 | 01/31/2008 |
G | 20036 | 162 | Analyze/Interpret Data | Abundance and Migration of Juvenile Salmonids in Study Streams During Migration Year 2007 | Data collected during project activities will be used to estimate abundance and in-subbasin migration patterns for juvenile spring Chinook salmon and summer steelhead in the four study streams of Catherine Creek, upper Grande Ronde River, Lostine River, and Minam River.
Migration timing to Lower Granite Dam of fish tagged in summer, fall, winter and spring, under Work Element E: Mark/Tag Fish, will be analyzed and compared by time of tagging, species and migratory year. In this performance period we will tag spring Chinook salmon and summer steelhead that will migrate to the ocean or be detected across multiple migration years. For example, migrants tagged in spring 2007 will migrate to the ocean in spring 2007, whereas the migrants tagged in the fall of 2007 will not migrate to the ocean until spring of 2008. Therefore, fish tagged in fall under the FY 2006 performance period will be analyzed along with the fish tagged in spring under this performance period, and likewise fish tagged in fall under this performance period will be analyzed along with the fish tagged under the FY 2008 performance period. Given the diversity of summer steelhead migration tactics, tagged fish may include small proportions of fish tagged during as many as three performance periods. | $79,483 | 10.00% | 09/01/2007 | 01/31/2008 |
H | 20037 | 162 | Analyze/Interpret Data | Survival and Relative Success of Juvenile Salmonids of the Grande Ronde and Imnaha Subbasins | Estimates of survival will be generated using PIT tag detection information for both spring Chinook salmon and summer steelhead, and will cover important early life stages as well as relative success of fish that emigrate early (fall) and late (spring) from study streams of the Grande Ronde and Imnaha river basins. Estimates of survival of summer parr to Lower Granite Dam, egg to migrant survival, overwinter survival and relative success of juvenile spring Chinook salmon and summer steelhead that emigrated early (fall) and late (spring) from the four study streams of Catherine Creek, upper Grande Ronde, Lostine, and Minam rivers during migration year 2006 | $79,483 | 10.00% | 09/01/2007 | 01/31/2008 |
I | 20038 | 162 | Analyze/Interpret Data | Egg to Migrant Survival Relative to the Stream Health and Life History Patterns of Chinook Salmon | The Oregon Plan for Salmon and Watersheds (OPSW) has assembled techniques for monitoring stream health. This investigation will utilize methods described by OPSW to compare spring Chinook salmon survival from egg to migrant to stream health metrics collected in previous years in each of four study streams. | $79,483 | 10.00% | 09/01/2007 | 01/31/2008 |
J | 20039 | 161 | Disseminate Raw/Summary Data and Results | Dissemination of Project Data and Results | Information collected during the investigation will be used to aid fisheries managers in effectively developing and evaluating policy related to fisheries management in the Basin. Data related to this investigation will be shared with others upon request. Results related to this investigation will be presented to comanagers and other fisheries professionals.
This work element will require travel to a professional conference (lodging and registration fees). | $39,741 | 5.00% | 02/01/2007 | 01/31/2008 |
K | 20040 | 132 | Produce Progress (Annual) Report | Annual Progress Report | FY07 Contract period annual progress report will be completed to fulfill reporting requirements of the contract and will serve as the document that contains the deliverables described in the work categories RM&E and Data Management Work Elements. | $79,483 | 10.00% | 08/01/2007 | 01/31/2008 |
L | 20044 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $7,948 | 1.00% | 07/01/2007 | 01/31/2008 |