A | 72204 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $150 | 0.08% | 07/01/2010 | 01/31/2011 |
B | 72205 | 119 | Manage and Administer Projects | Overall Project Management | Manage on-the-ground efforts. Also covers administrative work in support of on-the-ground efforts and in support of BPA's programmatic requirements such as metric reporting, financial reporting (e.g., accruals), and development of an SOW package (includes draft SOW, budget, spending plan, and property inventory). | $1,500 | 0.82% | 08/25/2010 | 01/30/2011 |
C | 72206 | 165 | Produce Environmental Compliance Documentation | EC for FY10 and pre-work for FY11 contract | Assemble, gather, acquire, or prepare documents in support of obtaining environmental compliance from BPA (such as filling out a NEPA Checklist, providing maps, obtaining permits, conducting public involvement activities, completing an archaeological survey, etc.). Ensure a compliance letter has been received, or is still valid, prior to commencing any affected work. | $3,000 | 1.64% | 02/01/2010 | 05/07/2010 |
D | 72207 | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead redd surveys in Entiat River | Conduct weekly steelhead spawning ground surveys (redd surveys) in the main Entiat River from March 1 to June 15 as conditions allow. Survey area is from Rkm 1.1 to 44.3 as conditions allow. Surveys will be conducted by raft and foot. | $45,000 | 24.53% | 02/01/2010 | 01/31/2011 |
E | 72208 | 157 | Collect/Generate/Validate Field and Lab Data | Operate smolt traps | Operate 2 smolt traps in Entiat River according to the ISEMP's Interim Protocols for the Capture, Handling, and Tagging of Wild Salmonids in the Upper Columbia River Basin using Passive Integrated Transponder (PIT) Tags and the Juvenile Trapping Protocol of the Upper Columbia Monitoring Strategy except as noted to conform to site-specific needs, Both are Working Drafts for 2010. | $103,763 | 56.57% | 03/01/2010 | 01/31/2011 |
F | 72209 | 157 | Collect/Generate/Validate Field and Lab Data | Operate and maintain PIT tag detection arrays on Entiat and Mad Rivers | The USFWS is responsible for the operation and maintenance of up to 5 PIT tag detection arrays located on the mainstem Entiat River (1 on lower and 1 upper Entiat) and Mad River (1) with location for two more arrays to be determined. These arrays provide passive recapture data used to provide survival and movement data from PIT tagged juvenile fish residing and moving around the Entiat and Mad Rivers. | $9,000 | 4.91% | 02/01/2010 | 12/31/2010 |
G | 72210 | 132 | Produce Progress (Annual) Report | Annual report covering the period 2/1/2010 to 01/31/2011 | This report will cover the snorkeling, redd surveys, and smolt trap work. Individual Annual reports are to be consolidated by the PI into a Project Level Annual Report, and only the consolidated report will be posted on the BPA website. | $1,000 | 0.55% | 09/01/2010 | 01/31/2011 |
H | 72224 | 157 | Collect/Generate/Validate Field and Lab Data | Conduct a mark-recapture study on the Entiat River as part of IMW | This task funds the USFWS to lead a mark-recapture study of juvenile anadromous salmonids at sites in the Entiat River watershed under the Entiat Intensively Monitored Watershed (IMW) experimental design.
The mark-recapture study will use various capture techniques including but not limited to electrofishing, seining, snerding, snorkel-herding, dip netting, and e-herding.
All USFWS staff involved with this survey work will be trained in various capture methods and have prior snorkeling experience. Snorkeling will be done in dry suits. Water temperature will be collected during each survey. | $20,000 | 10.90% | 05/01/2010 | 12/31/2010 |