A | 89672 | 30 | Realign, Connect, and/or Create Channel | Bayhorse Creek | Bayhorse Creek has been severely braided due to wanton irrigation practices. Irrigation water was diverted without a control structure, creating numerous blowoffs from the irrigation ditches back to the stream course. This project will block old abandoned irrigation ditches at the point of diversion and eliminate the braids. This is the final action of the tributary reconnection project. The elimination of the stream braids will confine the stream channel to its original stream course and concentrate flows for fish passage. | $0 | 0.00% | 07/01/2011 | 06/25/2012 |
B | 89676 | 55 | Erosion and Sedimentation Control | Hydro-seed BPA Funded Hooper Lane Culvert Replacement project | Perform machine hydro-seeding of mulch, seed, and a carrier to provide erosion control and ground stabilization following construction activities. Seeds are selected for the site based on native origin, site characteristics, and available moisture. Additional hydro-seeding is sometimes required to cover areas that did not sprout or that were disturbed by livestock or other factors. | $3,500 | 1.27% | 07/01/2011 | 05/30/2012 |
C | 89673 | 55 | Erosion and Sedimentation Control | Hydro-seed BPA Funded PBSC-09 Elimination Project | Perform machine hydro-seeding of mulch, seed, and a carrier to provide erosion control and ground stabilization following construction activities. Seeds are selected for the site based on native origin, site characteristics, and available moisture. Additional hydro-seeding is sometimes required to cover areas that did not sprout or that were disturbed by livestock or other factors. | $4,550 | 1.65% | 07/01/2011 | 05/30/2012 |
D | 87369 | 114 | Identify and Select Projects | Conduct meetings | Develop preliminary plans, projects and proposals. Includes coordination meetings with other agencies and private landowners. | $38,000 | 13.76% | 07/01/2011 | 05/30/2012 |
E | 87368 | 119 | Manage and Administer Projects | Routine Administration of Contract | Routine administration of contract including accrual and funding package. Supervise staff and manage individual projects. | $38,400 | 13.90% | 07/01/2011 | 06/30/2012 |
F | 89623 | 122 | Provide Technical Review and Recommendation | Technical Review and Recommendations for Fisheries Projects | Provide technical review of products not generated by this program, but funded by BPA. Reviews include engineering plans, specifications, and designs of structures, bifurcation devices, pipelines, roads, bridges, power lines, waterways, and instream structures for fisheries impacts. Field review would include tours of proposed projects with project sponsor to provide technical expertise in fisheries related matters. Provides fisheries data, evaluations, and recommendations to other fisheries enhancement project sponsors. Recommendations would include technical advice concerning dewatering methodologies during construction activities, assisting with language selection in biological assessments, permitting, and other submittals. | $16,300 | 5.90% | 07/01/2011 | 06/29/2012 |
G | 87374 | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period July 2010 thru June 2011 | The progress report summarizes the project goal, objectives, hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or level of effort for contract implementation, including any ramping up or ramping down of contract components or of the project as a whole. Date range July 2009 thru June 2010 will be agreed upon by the COTR and the contractor. This may or may not coincide with the contract period. For an ongoing project, a progress report covering a contract period may be submitted under the subsequent contract, if approved by the COTR.
Progress reports must conform to BPA guidelines. See the ''formatting guidelines'' link at the Technical Reports and Publications page: https://www.cbfish.org/Help.mvc/GuidanceDocuments.
If producing a technical report for this contract, a discrete experiment, or a peer-reviewed publication, use work element 183: Produce Journal Article. | $7,500 | 2.72% | 07/01/2011 | 10/30/2011 |
H | 89674 | 149 | Install Pipeline | LHC-08A/8B Consolidation | Consolidate the Hayden Creek-08A and -08B ditches and install a pipeline for water conservation. The LHC-08A ditch will be placed in pipe, bifurcation structures will divide the water into separate ditches, a pressure pipe will be installed on the line feeding the LHC-08B ditch. Riprap will be placed upon the outfall of the pressure pipe. The project will include the removal of the LHC-08B fish screen for refurbishing and deployment elsewhere. Over 90% of the total cost of the project will be borne by the irrigator. | $8,531 | 3.09% | 07/01/2011 | 05/30/2012 |
I | 87372 | 157 | Collect/Generate/Validate Field and Lab Data | Stream Investigations | Perform fisheries investigations on designated tributary streams to identify species absence or presence, distributions, densities, and habitat inventory. This work includes determination of landowner willingness to participate in future year fisheries improvement projects, mapping irrigation systems, and documentation of seasonal in stream flows, fish passage, and identifying water conservation potential. | $66,480 | 24.07% | 07/01/2011 | 05/30/2012 |
J | 87370 | 165 | Produce Environmental Compliance Documentation | Complete Environmental Compliance | Perform comprehensive cultural surveys in accordance with approved standards and practices in support of NEPA documentation for fish screens and fish passage projects. This work will be supplied by contract consultant.
Perform biological assessments, prepare documentation, and consult with the proper agencies for an ESA Section 7 Informal Consultation for all diversion improvement projects identified in the SOW within anadromous waters occupied by ESA listed species.
Prepare and submit routine regulatory paperwork including NEPA compliance checklists, SHPO required documents, CWA Section 404 permits, State and Federal special use permit applications, construction permits, and special validations. | $32,250 | 11.68% | 07/01/2011 | 05/30/2012 |
K | 87373 | 175 | Produce Design | Topographic Surveys | Survey proposed project sites. May include screen installation sites, head gate sites, diversion sites, or property boundaries. Develop topographic drawing of these sites and provide suitable temporary bench marks. Some of this work will be supplied by contract consultants. | $26,400 | 9.56% | 07/01/2011 | 06/30/2012 |
L | 89763 | 175 | Produce Design | Feasibility Preliminary Design Work | Engineering plans and designs as needed to determine feasibility of a project. May include elevation checks, piping flow comparisons and calculations. Verification of water depths and headgate capacities. Generation of preliminary lines, elevations, and grades to explore engineering options and contingencies in order to determine courses of action. Does not include final designs or full topographic surveys intended to complete a project. | $7,300 | 2.64% | 07/01/2011 | 06/29/2012 |
M | 87367 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $9,000 | 3.26% | 10/01/2011 | 06/30/2012 |
N | 87371 | 191 | Watershed Coordination | Agency Project Coordination | Coordinate watershed association activities. Identify opportunities to enhance natural resources within the Pahsimeroi River watershed, Bohannon Creek, and Big Timber Creek. Work with Tribes, BoR, OSC, USFWS, NRCS, local conservation districts, NGO's and stakeholders to identify problems and solutions within the watershed. Coordinate with agencies, stakeholders, and other entities on restoration and enhancement efforts to prevent duplication and enhance communication and cooperation. Work with landowners, interest groups and agencies to research and identify funding and cost share opportunities. | $18,000 | 6.52% | 07/01/2011 | 06/29/2012 |