A | 137549 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $300 | 0.06% | 07/01/2014 | 03/31/2015 |
B | 137550 | 119 | Manage and Administer Projects | Manage and Administer Projects | Manage the project in order to complete goals and objectives. | $7,934 | 1.47% | 03/01/2014 | 03/31/2015 |
C | 137551 | 100 | Construction Management | Construction Management | Manage all phases of work associated with the construction implementation including pre-implementation bidding, construction oversight and inspection. This work will be performed by both contractor (MRT) and subcontractors. | $24,750 | 4.60% | 03/01/2014 | 02/01/2015 |
D | 137552 | 30 | Realign, Connect, and/or Create Channel | Side channel construction and pond connection | Construction of 2,200ft long side channel at 0.1% slope west of the gravel ponds. Grading and construction of pond egress channels. Existing stockpiled material on-site and grading material will be used to achieve pond slopes ranging from 3:1 to 10:1. The constructed channel will incorporate a engineered riffles and LWD placement to address velocities and shear stresses. This element includes the costs associated with purchase, transport, and installation of material as needed. | $433,480 | 80.50% | 03/01/2014 | 11/30/2014 |
E | 137553 | 29 | Increase Aquatic and/or Floodplain Complexity | Increase Instream Habitat Complexity and Stabilization | Large wood structures will be placed within the side channel to provide stability, habitat, and flow control. This element includes costs associated with the purchase, delivery, and installation of structures. | $59,210 | 11.00% | 03/01/2014 | 11/30/2014 |
F | 137554 | 132 | Produce Progress (Annual) Report | Submit final report for the contract (3/1/14-3/31/15) | The progress report summarizes the project goal, objectives, hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or level of effort for contract implementation, including any ramping up or ramping down of contract components or of the project as a whole.
Progress reports must conform to BPA guidelines. See the ''formatting guidelines'' link at the Technical Reports and Publications page: https://www.cbfish.org/Help.mvc/GuidanceDocuments. | $1,783 | 0.33% | 01/01/2015 | 03/31/2015 |
G | 137555 | 165 | Produce Environmental Compliance Documentation | EC Compliance Documentation | Documentation of Environmental Compliance including but not limited to cultural resource inventory, biological consultation, and permits. | $3,000 | 0.56% | 03/01/2014 | 01/31/2015 |
H | 137556 | 47 | Plant Vegetation | Complete re-vegetation of site | Re-vegetation is a necessary final step to develop healthy habitat on the site as well as complete DOGAMI’s minimum requirements for gravel pit reclamation. Upon completion of the CARP construction work (Oct 2014), the site will be planted with native trees, shrubs, and grasses for structural stability and habitat diversity. | $8,060 | 1.50% | 09/15/2014 | 03/31/2015 |