| A | 165 | Produce Environmental Compliance Documentation | EC compliance | Includes all EC work in support of planned activities at Sekokini. Note: A Decision Notice to allow construction activities was issued by the USFS in April, 2011, after Environmental Assessment of the potential consequences of proposed new construction at Sekokini Springs. | | |
| B | 199 | Remove Vegetation | Weed control | MFWP is cooperating to control noxious weeds at the Sekokini Springs facility that sits on land leased from the USFS. This activity helps limit the spread of existing knapweed, thistles, tansy and other undesirable plant species, while reducing their overall abundance. MFWP will contribute herbicides and one or more project technicians to complete all weed treatments. Licensed applicators will conduct the application | Wildlife | |
| C | 174 | Produce Plan | Produce an annual operation plan | Sekokini Springs research facility is now incorporated as part of the Montana Sate Fish Hatchery System. All standard state hatchery operation, disease, and fish handling protocols are therefore already included into its existing operations plan. This required work element, by reference, is therefore already accomplished. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| D | 176 | Produce Hatchery Fish | Sustain exisiting fish culture operations and activities | Sekokini Springs already supports WCT conservation efforts with fish on station that need to be cared for in normal operations of the facility. This work is all activities related to normal administration and operation of the Sekokini Springs Research facility. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| E | 175 | Produce Design | Outdoor plumbing and water source design | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 through June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is all design work required for the outdoor plumbing and water source components of the continuing hatchery construction. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| F | 171 | Build, Modify, and/or Refurbish Artificial Production Facility | Outdoor plumbing and water source construction | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 through June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is actual construction for the outdoor plumbing and water source components of the continuing hatchery construction. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| G | 175 | Produce Design | Outdoor rearing pond design | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 throug June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is all design work required for the outdoor rearing ponds component of the continuing hatchery construction. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| H | 171 | Build, Modify, and/or Refurbish Artificial Production Facility | Outdoor rearing pond construction | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 throug June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is construction of the outdoor rearing ponds. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| I | 175 | Produce Design | UV decontamination system design | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 through June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is all design work required for the UV decontamination system to be installed at Sekokini Springs. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| J | 171 | Build, Modify, and/or Refurbish Artificial Production Facility | UV decontamination system installation | With the Council 3-step process for Sekokini Springs completed we continue improvements to the Sekokini Springs Hatchery facility now established as a westslope cutthroat trout research facility. At this point exterior upgrades to rearing ponds and the facility grounds remain to be completed. From October 1, 2013 through June 30, 2015 we intend to complete most outdoor plumbing and water source upgrades, and to substantially complete most outdoor rearing pond installation. The facility will have a UV decontamination system installed to treat discharge from the secure portions of the facility. We will also reinstall the facility security system to assure its proper function. No construction will occur before we secure all necessary and appropriate EC and other authorizations for this work.
This work element is all construction required for the UV decontamination system to be installed at Sekokini Springs | Cutthroat Trout, Westslope (O. c. lewisi) | |
| K | 119 | Manage and Administer Projects | Project M&A | All activities necessary to support, maintain, and manage this contract in collaboration with BPA. | | |
| L | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces Quarterly during each contract period. Reports shall be completed either quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | | |
| M | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period October 2013 to June 2014 | Annual progress reports summarizing the project achievements Two reports are intended through out the contract period, date range October 1, 2013 to June 15, 2014 and July 2014 through June 2015. Progress reports will conform to BPA guidelines. | | |
| N | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period July 2014 to June 2015 | Annual progress reports summarizing the project achievements Two reports are intended through out the contract period, date range October 1, 2013 to June 15, 2014 and July 2014 through June 2015. This is the second report. Progress reports will conform to BPA guidelines. | | |
| O | 174 | Produce Plan | Produce an annual operation plan | Sekokini Springs research facility is now incorporated as part of the Montana State Fish Hatchery System. All standard state hatchery operation, disease, and fish handling protocols are therefore already included into its existing operations plan. This required work element, by reference, is therefore already accomplished. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| P | 61 | Maintain Artificial Production Facility/Infrastructure | Water quality monitoring of artesian spring sources | Sekokini Springs Hatchery obtains its water from artesian spring sources. Water quality samples will be analyzed by the Montana Department of Health and Human Services laboratory to test for the presence of fecal coliform and E. coli bacteria contamination. This annual monitoring is important to protect the fishery mitigation investment of the westslope cutthroat trout conservation facility. | Cutthroat Trout, Westslope (O. c. lewisi) | |
| Q | 119 | Manage and Administer Projects | Project M&A | All activities necessary to support, maintain, and manage this contract in collaboration with BPA. | | |
| | | | | | | |